| EXECUTIVE SUMMARY |
|
1 |
Process Descriptions |
| |
1.1 |
Texaco Gasifier |
| 1.2 |
Air Separation Plant (ASU) |
| 1.3 |
Gas Cooling/Heat Recovery/Hydrolysis/Gas Saturation
(Case 1 and Case 2) |
| 1.4 |
Cold Gas Cleanup Unit (CGCU) (Case 1 and Case 2) |
| 1.5 |
Fine Particulate Removal / Chloride Guard Bed - Case
3 |
| 1.6 |
Transport Desulfurization HGCU - Case 3 |
| 1.7 |
Sulfuric Acid Plant - Case 3 |
| 1.8 |
Gas Turbine |
| 1.9 |
Steam Cycle |
| 1.10 |
Power Production |
|
2 |
Simulation Development |
|
3 |
Cost of Electricity Analysis |
| |
3.1 |
Coal Slurry Preparation |
| 3.2 |
Oxygen Plant |
| 3.3 |
Texaco Gasifier |
| 3.4 |
Low Temperature Gas Cooling and Gas Saturation (Cold
Gas Case Only) |
| 3.5 |
MDEA/Claus/SCOT Section (Cold Gas Case Only) |
| 3.6 |
Gas Conditioning (Hot Gas Case Only) |
| 3.7 |
Desulfurization Section (Hot Gas Case Only) |
| 3.8 |
Acid Plant Section (Hot Gas Case Only) |
| 3.9 |
Gas Turbine Section |
| 3.10 |
HRSG / Steam Turbine Section |
| 3.11 |
Bulk Plant Items |
| |
|
Appendix A |
COE Spreadsheets |
|
Appendix B |
Modifications made to 1998 IGCC Process System Study |