Return to DOE Report Table of Contents

Gasification Based Biomass Co-Firing,
Phase I, Final Report September 2002

Bapul Patel
Kevin McQuigg
Robert Toerne
John Bick
Philip Goldbergy

National Energy Technology Laboratory

Table of Contents (491KB)

DISCLAIMER i
ABSTRACT ii
EXECUTIVE SUMMARY vii

1

Introduction (623KB) 1
  1.1 Background Information 1
1.2 Gasification based Cofiring Concept 2
1.3 Western Kentucky Energy Case 2
1.4 TXU Energy Case 4
1.5 Primenergy Gasifier 4
1.6 Phase I Organization, Tasks and Schedule 6

2

Technology Evaluation (489KB) 10
 

2.1

Overview of Co-firing Technologies 10
  2.1.1 Low Percentage Co-Firing 10
2.1.2 Direct Combustion Co-Firing with Separate Feed Systems 10
2.1.3 Issues remaining to be resolved with co-firing 11
2.2 Gasification Technologies 12
2.3 Hot Gas Filtration System 14
2.4 Environmental Impact of Gasification 14
 

2.4.1

Comparison of Coal vs. Litter Burn 16

3

Project Evaluation (2.62MB) 18
 

3.1

WKE Case 18
  3.1.1 WKE Reid Plant 18
3.1.2 Reid Plant Boiler Data 20
3.1.3 Gasifier Material and Energy Balance 20
3.1.4 Gasifier Boiler Integration 22
3.1.5 Overall Plant Energy Balance 23
3.1.6 Solids Handling Systems 24
3.1.7 Permit Issues 25
3.1.8 Fuel Contracts 28
3.1.9 Major Equipment List 29
3.1.10 Equipment Layout 31

3.2

TXU Energy Case 32
  3.2.1 TXU Monticello Plant 32
3.2.2 Monticello Unit 1 Boiler Data 33
3.2.3 Gasifier Material and Energy Balance 34
3.2.4 Gasifier Boiler Integration 36
3.2.5 Overall Plant Energy Balance 36
3.2.6 Solids Handling Systems 37
3.2.7 Permit Issues 41
3.2.8 Fuel Contracts 43
3.2.9 Major Equipment List 43
3.2.10 Gasification Plant Layout 45

4

Economic Analysis (442KB) 46
 

4.1

Reid Plant Case 46
  4.1.1 Capital and O&M Cost Estimate 46
4.1.2 Financial Pro Forma 48
4.1.3 Sensitivity Analysis for Reid Plant Case 49

4.2

Monticello Unit 1 Case 52
  4.2.1 Capital and O&M Cost Estimate 52
4.2.2 Financial Pro Forma 55
4.2.3 Sensitivity Analysis for Monticello Case 56

5

Results and Discussion (323KB) 57
  5.1 Infrastructure/Fuel Supply and Alternative Fuels 57
5.2 Merits of the Project 58
  5.2.1 Energy Benefits and Impacts 58
5.2.2 Environmental Benefits and Impacts 58
5.2.3 Economic Benefits and Impacts 59
5.2.4 Infrastructure/Fuel Supply Benefits and Impacts 60

5.3

Project Sustainability and Opportunities for Replication 60

6

Conclusions (145KB) 62

7

References & Bibliography (60.8KB) 65
 

7.1

References & Bibliography 65
 

 

   
APPENDIX A - WKE CASE (1.88MB)
APPENDIX B - TXU CASE (3.26MB)
APPENDIX C - BB Power Report on Boiler Penetraions (2.01MB)
 
LIST OF FIGURES
Figure 1-1 Gasification Based Biomass Co-Firing System Diagram 2
Figure 1-2 Poultry Supply in Vicinity of Reid Plant 3
Figure 1-3 Primenergy Gasifier - simplified sketch 6
Figure 1-4 Project Organization Chart 7
Figure 1-5 Interrelationships of Tasks in Phase I 8
Figure 1-6 Project Milestone Schedule 9
Figure 3-1 Reid Plant Boiler Schematic 19
Figure 3-2 Heat input to the boiler with cofiring 26
Figure 3-3 Expected NOx emissions with cofiring 27
Figure 3-4 Expected SO2 emissions with cofiring 27
Figure 3-5 Monticello Plant Unit 1 32
Figure 3-6 Heat Input to the boiler with cofiring 41
Figure 3-7 Reported NOx and SOx emissions at Monticello Plant 42
Figure 4-1 COE Sensitivity to Fuel Price and Ash Credit 51
     
LIST OF TABLES
Table 1-1 Poultry production estimate by Texas Agricultural Department (1997) 4
Table 2-1 Selected Greenhouse Gases Prior to 1850 vs 1994 15
Table 2-2 Unabated Emissions Data for Poultry Litter Test Gasification Run 16
Table 2-3 Coal and Litter Composition and Expected Emissions 17
Table 3-1 Reid Plant Boiler Operating Data 20
Table 3-2 Material Balance for the Gasifier 21
Table 3-3 Energy Balance for the Gasifier 22
Table 3-4 Energy Balance and Power Production for Reid Plant 24
Table 3-5 Gasifier Island Equipment List 30
Table 3-6 Material Handling System Equipment List 31
Table 3-7 Design Specifications for Monticello Unit 1 33
Table 3-8 Monticello Boiler Fuel Analyses 34
Table 3-9 Material Balance for the gasifier 35
Table 3-10 Energy Balance for the gasifier 36
Table 3-11 Energy Balance and Power Production for Monticello Case 37
Table 3-12 Gasifier Island Equipment List 44
Table 3-13 Material Handling Equipment List 45
Table 4-1 Capital Cost Estimates for the Fuel Storage and Conveying 46
Table 4-2 Total Capital Cost for WKE's Case 46
Table 4-3 Operation, Maintenance and Fuel Cost Estimate - WKE Case 47
Table 4-4 Input Financial Parameters 48
Table 4-5 Levelized Cost of Electricity for WKE Case 49
Table 4-6 COE Sensitivity Analyses for Reid Case 50
Table 4-7 Capital Cost Estimates for Fuel Storage and Conveying 52
Table 4-8 Total Capital Cost for the Monticello Plant 53
Table 4-9 Operation, Maintenance and Fuel Cost Estimate - Monticello Case 54
Table 4-10 Levelized Cost of Electricity for Monticello Case 55
Table 4-11 COE Sensitivity Analyses for Monticello Case 56