ABSTRACT |
ii |
EXECUTIVE SUMMARY |
vii |
1 |
Introduction (623KB) |
1 |
|
1.1 |
Background Information |
1 |
1.2 |
Gasification based Cofiring Concept |
2 |
1.3 |
Western Kentucky Energy Case |
2 |
1.4 |
TXU Energy Case |
4 |
1.5 |
Primenergy Gasifier |
4 |
1.6 |
Phase I Organization, Tasks and Schedule |
6 |
2 |
Technology Evaluation
(489KB) |
10 |
|
2.1 |
Overview of Co-firing Technologies |
10 |
|
2.1.1 |
Low Percentage Co-Firing |
10 |
2.1.2 |
Direct Combustion Co-Firing with Separate Feed Systems |
10 |
2.1.3 |
Issues remaining to be resolved with co-firing |
11 |
2.2 |
Gasification Technologies |
12 |
2.3 |
Hot Gas Filtration System |
14 |
2.4 |
Environmental Impact of Gasification |
14 |
|
2.4.1 |
Comparison of Coal vs. Litter Burn |
16 |
3 |
Project Evaluation
(2.62MB) |
18 |
|
3.1 |
WKE Case |
18 |
|
3.1.1 |
WKE Reid Plant |
18 |
3.1.2 |
Reid Plant Boiler Data |
20 |
3.1.3 |
Gasifier Material and Energy Balance |
20 |
3.1.4 |
Gasifier Boiler Integration |
22 |
3.1.5 |
Overall Plant Energy Balance |
23 |
3.1.6 |
Solids Handling Systems |
24 |
3.1.7 |
Permit Issues |
25 |
3.1.8 |
Fuel Contracts |
28 |
3.1.9 |
Major Equipment List |
29 |
3.1.10 |
Equipment Layout |
31 |
3.2 |
TXU Energy Case |
32 |
|
3.2.1 |
TXU Monticello Plant |
32 |
3.2.2 |
Monticello Unit 1 Boiler Data |
33 |
3.2.3 |
Gasifier Material and Energy Balance |
34 |
3.2.4 |
Gasifier Boiler Integration |
36 |
3.2.5 |
Overall Plant Energy Balance |
36 |
3.2.6 |
Solids Handling Systems |
37 |
3.2.7 |
Permit Issues |
41 |
3.2.8 |
Fuel Contracts |
43 |
3.2.9 |
Major Equipment List |
43 |
3.2.10 |
Gasification Plant Layout |
45 |
4 |
Economic Analysis
(442KB) |
46 |
|
4.1 |
Reid Plant Case |
46 |
|
4.1.1 |
Capital and O&M Cost Estimate |
46 |
4.1.2 |
Financial Pro Forma |
48 |
4.1.3 |
Sensitivity Analysis for Reid Plant Case |
49 |
4.2 |
Monticello Unit 1 Case |
52 |
|
4.2.1 |
Capital and O&M Cost Estimate |
52 |
4.2.2 |
Financial Pro Forma |
55 |
4.2.3 |
Sensitivity Analysis for Monticello Case |
56 |
5 |
Results and
Discussion (323KB) |
57 |
|
5.1 |
Infrastructure/Fuel Supply and Alternative Fuels |
57 |
5.2 |
Merits of the Project |
58 |
|
5.2.1 |
Energy Benefits and Impacts |
58 |
5.2.2 |
Environmental Benefits and Impacts |
58 |
5.2.3 |
Economic Benefits and Impacts |
59 |
5.2.4 |
Infrastructure/Fuel Supply Benefits and Impacts |
60 |
5.3 |
Project Sustainability and Opportunities for
Replication |
60 |
6 |
Conclusions (145KB) |
62 |
7 |
References &
Bibliography (60.8KB) |
65 |
|
7.1 |
References & Bibliography |
65 |
|
|
|
|
APPENDIX A - WKE
CASE (1.88MB) |
APPENDIX B - TXU
CASE (3.26MB) |
APPENDIX C - BB
Power Report on Boiler Penetraions (2.01MB) |
|
LIST OF FIGURES |
Figure 1-1 |
Gasification Based Biomass Co-Firing System Diagram |
2 |
Figure 1-2 |
Poultry Supply in Vicinity of Reid Plant |
3 |
Figure 1-3 |
Primenergy Gasifier - simplified sketch |
6 |
Figure 1-4 |
Project Organization Chart |
7 |
Figure 1-5 |
Interrelationships of Tasks in Phase I |
8 |
Figure 1-6 |
Project Milestone Schedule |
9 |
Figure 3-1 |
Reid Plant Boiler Schematic |
19 |
Figure 3-2 |
Heat input to the boiler with cofiring |
26 |
Figure 3-3 |
Expected NOx emissions with cofiring |
27 |
Figure 3-4 |
Expected SO2 emissions with cofiring |
27 |
Figure 3-5 |
Monticello Plant Unit 1 |
32 |
Figure 3-6 |
Heat Input to the boiler with cofiring |
41 |
Figure 3-7 |
Reported NOx and SOx emissions
at Monticello Plant |
42 |
Figure 4-1 |
COE Sensitivity to Fuel Price and Ash Credit |
51 |
|
|
|
LIST OF TABLES |
Table 1-1 |
Poultry production estimate by Texas Agricultural
Department (1997) |
4 |
Table 2-1 |
Selected Greenhouse Gases Prior to 1850 vs 1994 |
15 |
Table 2-2 |
Unabated Emissions Data for Poultry Litter Test
Gasification Run |
16 |
Table 2-3 |
Coal and Litter Composition and Expected Emissions |
17 |
Table 3-1 |
Reid Plant Boiler Operating Data |
20 |
Table 3-2 |
Material Balance for the Gasifier |
21 |
Table 3-3 |
Energy Balance for the Gasifier |
22 |
Table 3-4 |
Energy Balance and Power Production for Reid Plant |
24 |
Table 3-5 |
Gasifier Island Equipment List |
30 |
Table 3-6 |
Material Handling System Equipment List |
31 |
Table 3-7 |
Design Specifications for Monticello Unit 1 |
33 |
Table 3-8 |
Monticello Boiler Fuel Analyses |
34 |
Table 3-9 |
Material Balance for the gasifier |
35 |
Table 3-10 |
Energy Balance for the gasifier |
36 |
Table 3-11 |
Energy Balance and Power Production for Monticello
Case |
37 |
Table 3-12 |
Gasifier Island Equipment List |
44 |
Table 3-13 |
Material Handling Equipment List |
45 |
Table 4-1 |
Capital Cost Estimates for the Fuel Storage and
Conveying |
46 |
Table 4-2 |
Total Capital Cost for WKE's Case |
46 |
Table 4-3 |
Operation, Maintenance and Fuel Cost Estimate - WKE
Case |
47 |
Table 4-4 |
Input Financial Parameters |
48 |
Table 4-5 |
Levelized Cost of Electricity for WKE Case |
49 |
Table 4-6 |
COE Sensitivity Analyses for Reid Case |
50 |
Table 4-7 |
Capital Cost Estimates for Fuel Storage and
Conveying |
52 |
Table 4-8 |
Total Capital Cost for the Monticello Plant |
53 |
Table 4-9 |
Operation, Maintenance and Fuel Cost Estimate -
Monticello Case |
54 |
Table 4-10 |
Levelized Cost of Electricity for Monticello Case |
55 |
Table 4-11 |
COE Sensitivity Analyses for Monticello Case |
56 |