Abstract |
ii |
Section 1 |
Background and Summary |
1 |
|
1.1 |
Introduction |
1 |
1.2 |
Contract Objectives |
1 |
1.3 |
CCG Process Concept |
2 |
1.4 |
Facilities Description for a Commercial-Scale
CCG Plant |
2 |
1.5 |
Summary of Results |
4 |
1.6 |
Qualifications of Results |
5 |
|
Tables |
1.1 |
Summary of Key Results |
7 |
|
Figures |
1.1 |
Exxon Catalytic Gasification Process |
8 |
1.2 |
Flowplan for Catalyst Addition; Recovery and
Recycle |
9 |
1.3 |
Flowplan for Recycle Gas Loop |
10 |
1.4 |
Reactor System Sketch |
11 |
|
Section 2 |
Study Design and Cost Estimate for a Grass-Roots
Large Pilot Plant |
12 |
|
2.1 |
Project Basis |
12 |
2.2 |
Process Basis |
12 |
2.3 |
Design Philosophy |
12 |
2.4 |
LLP Size - Key Scaleup Issues |
13 |
2.5 |
Grass-Roots Case Flow Plan Basis |
14 |
2.6 |
Investment Summary Grass-Roots Case |
15 |
|
Tables |
2.1 |
Illinois No. 6 Coal Analysis |
17 |
2.2 |
Investment Summary for Grass-Roots Large Pilot
Plant |
18 |
2.3 |
Direct Cost Summary Grass-Roots Large Pilot
Plant |
19 |
2.4 |
Basis for Cost Escalation Estimate Grass-Roots
Large Pilot Plant |
20 |
2.5 |
Operating Cost Summary Grass-Roots Large Pilot
Plant |
21 |
2.6 |
Service Factor Basis |
22 |
2.7 |
Operating Cost Estimating Basis for Grass-Roots
Large Pilot Plant |
23 |
|
Figures |
2.1 |
Grass-Roots Case Insite Coordination Flow Plan |
26 |
2.2 |
Engineering and Construction Schedule for
Grass-Roots Large Pilot Plant |
27 |
|
Section 3 |
Selection of The Preferred Existing Pilot Plant |
28 |
|
3.1 |
Introduction |
28 |
3.2 |
Factors Considered in Evaluation |
28 |
3.3 |
Land Availability Comparison |
29 |
3.4 |
Reusable Equipment Comparison |
30 |
3.5 |
Conclusions |
30 |
|
Tables |
3.1 |
Comparison of Facilities Spacing for Proposed
Modifications to Existing Pilot Plants |
34 |
3.2 |
Existing Facilities Comparison: Coal Receipt,
Storage and Preparation |
35 |
3.3 |
Existing Facilities Comparison: Gasifier, Char
Handling and Gas Processing |
36 |
3.4 |
Existing Facilities Comparisons: Utilities and
Disposal Systems |
39 |
3.5 |
Facilities to be Dismantled |
41 |
|
Figures |
3.1 |
Plot Plan Revisions Synthane Pilot Plant |
44 |
3.2 |
Plot Plan Revisions HYGAS Pilot Plant |
45 |
3.3 |
Plot Plan Revisions Steam-Iron Pilot Plant |
46 |
|
Section 4 |
Study Design and Cost Estimate for Major
Synthane Revamp |
47 |
|
4.1 |
Project Basis |
47 |
4.2 |
Process Basis |
47 |
4.3 |
Design Philosophy |
47 |
4.4 |
LLP Size |
47 |
4.5 |
Summary of Modifications to Synthane Plant |
47 |
4.6 |
Investment Summary for Major Synthane Revamp |
49 |
|
Tables |
4.1 |
Catalytic Gasification LPP: Summary of
Facilities Differences Grass Roots Versus Major Synthane Revamp |
52 |
4.2 |
Investment Summary for Major Synthane Revamp |
53 |
4.3 |
Basis for Cost Escalation Estimate - Major
Synthane Revamp |
54 |
4.4 |
Total Erected Cost Comparison: Major Synthane
Revamp Versus Grass-Roots |
55 |
4.5 |
Direct Cost Summary - Major Synthane Revamp |
56 |
4.6 |
Direct Cost Breakdown: Grass-Roots Versus Major
Synthane Revamp |
57 |
4.7 |
Operating Cost Summary - Major Synthane Revamp |
58 |
4.8 |
Operating Cost Estimating Basis - Major Synthane
Revamp |
59 |
|
Figures |
4.1 |
Block Process Diagram Major Synthane
Modification Case |
62 |
4.2 |
Engineering and Construction Schedule-Major
Synthane Revamp |
63 |
|
Section 5 |
Study Design and Cost
Estimate for Minimum Synthane Revamp |
64 |
|
5.1 |
Project Basis |
64 |
5.2 |
Process Basis |
64 |
5.3 |
Design Philosophy |
64 |
5.4 |
LPP Size |
64 |
5.5 |
Summary of Modifications for Synthane Revamp |
65 |
5.6 |
Investment Summary - Minimum Synthane Revamp |
68 |
|
Tables |
5.1 |
Comparison of Revamp Alternatives Conversion of
Synthane to CCG Operation |
69 |
5.2 |
Synthane Minimum Modification Revamp Project
Cost Summary |
70 |
5.3 |
Estimate Basis Synthane Minimum Modification
Revamp |
71 |
5.4 |
Synthane Minimum Modification Revamp Direct Cost
Summary |
74 |
5.5 |
Synthane Minimum Modification Revamp Operating
Cost Summary |
75 |
|
Figures |
5.1 |
Synthane Revamp Minimum Modification Case |
76 |
5.2 |
Synthane Minimum Modification Revamp |
77 |
5.3 |
Project Schedule |
77 |
|
Appendix 1: Details of Study Design for Grass Roots Case (4.8MB) |
Appendix 2: Details of Study Design for Major Synthane Revamp
Case (3.45MB) |
Appendix 3: Details of Study Design for Minimum Synthane Revamp
Case (2.64MB) |