I |
Executive Summary |
1 |
II |
Introduction |
4 |
III |
LaPorte LPMEOH PDU Description |
6 |
|
A |
Background |
6 |
B |
Process Design Basis |
7 |
C |
Process Description |
10 |
D |
LaPorte LPMEOH PDU Modifications |
13 |
E |
Process Equipment Additions to LaPorte LPMEOH PDU |
17 |
IV |
Gas Holdup Test and Poisons Survey |
19 |
|
A |
Two-Phase Gas Holdup Studies |
19 |
B |
Carbonyl Surveys |
30 |
V |
High Slurry Concentration Run (Run E-2) |
48 |
|
A |
Objectives |
48 |
B |
In-Situ Reduction |
48 |
C |
Methanol Synthesis Operation |
49 |
D |
Discussion of Results |
55 |
VI |
Activity Maintenance |
70 |
|
A |
Objectives |
70 |
B |
In-Situ Reduction |
70 |
C |
Methanol Synthesis Operation |
70 |
D |
Discussion of Results |
72 |
VII |
Conclusions and Recommendations |
96 |
VIII |
References |
98 |
IX |
Appendixes |
99 |
|
A |
Chemical Wash of LaPorte LPMEOH PDU |
99 |
|
B |
April 1985 Metallurgical Change-out |
107 |
|
C |
Nuclear Density Gauge Calibration |
111 |
|
D |
LaPorte LPMEOH PDU Inspection After Carbonyl Survey (11-12 March 1985) |
122 |
|
E |
Run E-2 Detailed Data Acquisition Sheets |
126 |
|
F |
Run E-3 Detailed Data Acquisition Sheets |
163 |