Return to DOE Report Table of Contents
Return to Baseline Design/Economics
Table of Contents
Baseline Design/Economics for Advanced Fischer-Tropsch
Technology.
Quarterly Report for July to September 1993
Bechtel Corp.
In this pdf format, this
document has 66 pages and is 2.72MB.
Table of Contents
1 |
Introduction and Summary |
1-1 |
|
1.1 |
Introduction |
1-1 |
1.2 |
Summary |
1-2 |
|
2 |
Task 1 - Alternate (ZSM-5) Refining Case |
2-1 |
|
2.1 |
Design Basis and Specific Considerations |
2-1 |
2.2 |
Block Flow Diagram |
2-2 |
2.3 |
Process Flow Diagram |
2-2 |
2.4 |
F-T Synthesis/ZSM-5 Process Description |
2-2 |
2.5 |
Material Balance Summary |
2-7 |
|
3 |
Task 4 - Aspen/SP Simulation Model Development |
3-1 |
|
3.1 |
Area 200-F-T Synthesis Loop Model |
3-1 |
3.2 |
Plant 31 - Utility Plant |
3-2 |
3.3 |
Overall Baseline Case Model |
3-3 |
3.4 |
Alternate Refining Case - Area 300 Model |
3-11 |
|
4 |
Project Management & Staffing Report |
4-1 |
|
4.1 |
Project Management |
4-1 |
4.2 |
Staffing Report |
4-1 |
|