Return to DOE Report Table of Contents

Return to Baseline Design/Economics Table of Contents

Baseline Design/Economics for Advanced Fischer-Tropsch Technology.
Quarterly Report for July to September 1993

Bechtel Corp.

In this pdf format, this document has 66 pages and is 2.72MB.

Table of Contents

1

Introduction and Summary 1-1
 

1.1

Introduction 1-1

1.2

Summary 1-2
 

2

Task 1 - Alternate (ZSM-5) Refining Case 2-1
 

2.1

Design Basis and Specific Considerations 2-1

2.2

Block Flow Diagram 2-2

2.3

Process Flow Diagram 2-2

2.4

F-T Synthesis/ZSM-5 Process Description 2-2

2.5

Material Balance Summary 2-7
 

3

Task 4 - Aspen/SP Simulation Model Development 3-1
 

3.1

Area 200-F-T Synthesis Loop Model 3-1

3.2

Plant 31 - Utility Plant 3-2

3.3

Overall Baseline Case Model 3-3

3.4

Alternate Refining Case - Area 300 Model 3-11
 

4

Project Management & Staffing Report 4-1
 

4.1

Project Management 4-1

4.2

Staffing Report 4-1