1 |
Introduction and Summary |
1-1 |
|
1.1 |
Introduction |
1-1 |
1.2 |
Summary |
1-2 |
|
2 |
Preliminary Design for Syngas Production |
2-1 |
|
2.1 |
Sour Water Stripper (Plant 105) |
2-1 |
2.2 |
Sulfur Recovery & Tail gas Treating (Plant 107) |
2-2 |
2.3 |
Air Separation (Plant 110) |
2-5 |
|
3 |
Preliminary F-T Reaction Loop Design |
3-1 |
|
3.1 |
Carbon Dioxide Removal (Plant 202) |
3-1 |
3.2 |
Autothermal Reformer (Plant 206) |
3-3 |
|
4 |
Development of a Process Simulation Model |
4-1 |
|
4.1 |
Coal Receiving and Storage (Plant 101) |
4-1 |
4.2 |
Coal Drying and Grinding (Plant 102) |
4-1 |
4.3 |
Shell Gasifier (Plant 103) |
4-1 |
4.4 |
Syngas Treating and Cooling (Plant 104) |
4-1 |
4.5 |
Sour Water Stripping (Plant 105) |
4-2 |
4.6 |
Acid Gas Removal (Plant 106) |
4-2 |
4.7 |
Sulfur Polishing (Plant 108) |
4-2 |
4.8 |
Syngas Wet Scrubbing (Plant 109) |
4-2 |
4.9 |
Air Separation (Plant 110) |
4-2 |
4.10 |
Overall Plant Simulation (Area 100) |
4-3 |
|
5 |
Project Management |
5-1 |
|
5.1 |
Project Management |
5-1 |
5.2 |
Staffing Report |
5-1 |