COOPERATIVE AGREEMENT |
1 |
DISCLAIMER |
ii |
ABSTRACT |
iii |
TABLE OF CONTENTS |
iv |
LIST OF TABLES |
vi |
LIST OF FIGURES |
vii |
1.0 |
EXECUTIVE SUMMARY |
1 |
|
1.1 |
INTRODUCTION |
1 |
1.2 |
PLANT DESIGN |
1 |
1.3 |
EXPERIMENTAL |
1 |
1.4 |
RESULTS AND DISCUSSION |
2 |
1.5 |
CONCLUSIONS |
2 |
2.0 |
INTRODUCTION |
1 |
|
2.1 |
BACKGROUND |
1 |
2.2 |
PROJECT OUTLINE AND OBJECTIVES |
1 |
2.3 |
PROJECT PARTICIPANTS |
2 |
3.0 |
PLANT DESIGN STUDY & ECONOMIC ANALYSIS |
3 |
|
3.1 |
STUDY BASIS |
3 |
|
3.1.1 |
Plant Design Basis |
3 |
3.1.2 |
Site Characteristics |
3 |
3.1.3 |
Biomass Fuel Characteristics |
3 |
3.1.4 |
Emissions Standards |
4 |
3.2 |
PLANT DESCRIPTION |
5 |
|
3.2.1 |
Overall Plant Description |
5 |
3.2.2 |
Systems and Components of the Plant |
6 |
3.2.3 |
Implementation Steps |
7 |
3.3 |
MAJOR PLANT AREAS |
15 |
|
3.3.1 |
Biomass Drying System |
15 |
3.3.2 |
Gasification Plant |
17 |
3.3.3 |
Boiler Modification and Internal Air Heating |
31 |
3.3.4 |
External High Temperature High Pressure Air Heater
AH-1 |
46 |
3.3.5 |
Power Generation |
47 |
3.3.6 |
Heat Recovery |
54 |
3.3.7 |
Balance of Plant |
55 |
3.3.8 |
Construction Schedule |
64 |
3.4 |
PLANT OPERATION |
65 |
3.5 |
PLANT PERFORMANCE |
70 |
|
3.5.1 |
Feed/Product Summary |
70 |
3.5.2 |
Efficiencies |
71 |
3.5.3 |
Emissions Inventory |
71 |
3.6 |
PLANT LAYOUT |
73 |
3.7 |
PLANT PERMITTING REQUIREMENTS |
74 |
3.8 |
CAPITAL COST ESTIMATE |
78 |
|
3.8.1 |
Cost Estimating Approach and Basis |
78 |
3.8.2 |
Data Source for the Estimate |
79 |
3.8.3 |
Estimated Capital Cost |
80 |
3.9 |
OPERATING AND MAINTENANCE COST ESTIMATE |
80 |
3.10 |
ECONOMIC ANALYSIS |
83 |
|
3.10.1 |
Annual Savings |
83 |
3.10.2 |
Annual Expenses |
84 |
3.10.3 |
Payback Period |
84 |
3.10.4 |
Demonstration vs. Commercial Plant Economics |
84 |
4.0 |
EXPERIMENTAL |
90 |
|
4.1 |
INSTITUTE OF PAPER SCIENCE AND TECHNOLOGY BARK
DRYING VOC STUDY |
90 |
4.2 |
HIGH-TEMPERATURE HIGH-PRESSURE AIR HEATER MATERIALS
TESTING |
97 |
5.0 |
RESULTS AND DISCUSSION |
100 |
|
5.1 |
FINDINGS FOR THE DERIDDER MILL |
100 |
5.2 |
APPLICATION OF THE TECHNOLOGY TO OTHER MILLS |
102 |
6.0 |
CONCLUSIONS |
103 |
7.0 |
REFERENCES |
105 |
8.0 |
LIST OF ACRONYMS AND ABBREVIATIONS |
106 |
9.0 |
FIGURES |
108 |
APPENDIX A EQUIPMENT LIST |
131 |
APPENDIX B SOLAR TURBINES INCORPORATED Final Report |
136 |