Return to DOE Report Table of Contents - W

Return to the Early Entrance Co-Production Plant Table of Contents

Early Entrance Co-Production Plant - Decentralized Gasification Cogeneration Transportation Fuels and Steam From Available Feedstocks Quarterly Technical Progress Report July to September 2001- 2001

In this pdf format, this document has 44 pages and is 4.16 MB.

Waste Processors Management, Inc.

Table of Contents

1.

Introduction and Summary

1-1
 

1.1

Introduction

1-1
 

1.1.1

Phase I - Concept Definition and RD&T Planning

1-1

1.1.2

Phase II - R&D and Testing

1-1

1.1.3

Phase III - Preliminary Engineering Design

1-2

1.2

Summary

1-2

2.

Phase I Task 3 - System Technical Assessment

2-1
 

2.1

Ash Fusion Temperature Prediction for EECP Coal Feeds

2-1
 

2.1.1

Summary of Results and Applications

2-1

2.1.2

Methodology Review and Ash Fusion Temperature Correlations

2-4
 

2.1.2.1

Coal Ash Fusion Data

2-5

2.1.2.2

Correlation Assessment and Accuracy

2-9
 

Pennsylvania Coal

2-10

Other Coal Samples

2-12

EECP Coal Feeds

2-14

EECP Blended Feeds

2-16

2.1.3

Conclusion

2-17

2.2

Preliminary EECP Plant Balances

2-19
 

2.2.1

EECP Configuration

2-19

2.2.2

Preliminary EECP Plant Balance Summary

2-21

3.

Phase I Task 4 - Feasibility Design Package Development

3-1

4.

Phase I Task 5 - Market Analysis

4-1

5.

Phase I Task 6 - Preliminary Site Analysis

5-1
 

5.1

EECP Large Vessel Transportation Assessment

5-1
 

5.1.1

Proposed EECP Site Location and Conditions

5-1

5.1.2

Summary Results

5-4

5.2

Transportation

5-4
 

5.2.1

Site Access by Truck

5-4

5.2.2

Site Access by Rail

5-5

5.2.3

Site Access by Barge

5-5

5.2.4

Ports of Import

5-6

5.3

Reactor and Transportation Cost Estimates

5-6

6.

Project Management

6-1
 

6.1

Biweekly Project Status Report

6-1

6.2

Project Milestones Plan and Log

6-1

7.

Experimental

7-1

7.1

Executive Summary

7-1

7.2

Experimental

7-1

7.3

Results and Discussion

7-1
7.4 Conclusion 7-1
7.5 References 7-1