Return to DOE Report Table of Contents - T

Return to the Early Entrance Co-Production Plant Table of Contents

Early Entrance Co-Production Plant Phase II -
Final Report from January 2001 to June 2003

Authors - See Report

Texaco Energy Systems Inc.

In this pdf format, this document has 65 pages and is 708.9kb.

Table of Contents

DISCLAIMER II
ABSTRACT III
TABLE OF CONTENTS IV
LIST OF FIGURES V
LIST OF TABLES VI
EXECUTIVE SUMMARY 1
INTRODUCTION 2
RESULTS AND DISCUSSIONS 4
  TASK 2.1: Fischer-Tropsch Pilot Plant Confirmation 8
  Major Findings: Catalyst Rejuvenation/Regeneration 11
Major Findings: Catalyst Addition/Withdrawl 12
Major Findings: Pilot Test in a Bubble Column Reactor 12
TASK 2.2: F-T Mathematical Model and Reactor Scale-Up Confirmation 13
  Major Findings: F-T Mathematical Model 14
TASK 2.3: Fischer-Tropsch Catalyst/Wax Separation 14
  Major Findings: F-T Catalyst/Wax Separation 17
TASK 2.4: Low British Thermal Unit (BTU) Gas Combustion Test 18
  Major Findings: Low BTU Gas Combustion Test 23
TASK 2.5: F-T Product Upgrading 24
  Major Findings: F-T Product Upgrading 26
TASK 2.6: F-T Diesel Fuel/Engine Performance and Emissions 37
  Major Findings: F-T Lubricity Testing 37
Major Findings: Hot-Start Cycle Transient Engine Test 41
Major Findings: Solvent Extraction of Particulate Matter 41
TASK 2.7: Petroleum Coke Analysis 44
  Major Findings: Petroleum Coke Analysis 45
TASK 2.8: Carbon Dioxide Stripping From Methyldiethanolamine (MDEA) 45
  Major Findings: Carbon Dioxide Stripping From MDEA 46
TASK 2.9: Integration 47
  Major Findings: Petroleum Coke Slurry with F-T Water 48
Major Findings: Spent F-T Catalyst in Fluxant 49
TASK 2.10: Environmental 50
TASK 3.0: Additional RD&T 52
  Major Findings: Filter Performance 53
TASK 4.0: Design Basis Update 54
  Major Findings: Design Basis Update 55
CONCLUSION 56
LIST OF ACRONYMS AND ABBREVIATIONS 58
 
LIST OF FIGURES

Figure 1

EECP Conceptual Design 5
Figure 2 Catalyst Withdrawal and Addition 9
Figure 3 F-T Pilot Plant Confirmation Test 10
Figure 4 F-T Mathematical Model Results 13
Figure 5 Catalyst/Wax Separation Test Sequence 16
Figure 6 Cleaned Wax produced by LCI Scepter® Micro-Filtration System 17
Figure 7 Combustion Laboratory Test Stand Schematic 19
Figure 8 Task 2.5 F-T Product Upgrading and Task 2.6 Fuel/Engine Emission 25
Figure 9 Flow of WOrk for Subtask 2.5.6 Diesel Blending Testing 28
Figure 10 Cetane Number Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 29
Figure 11 Pour Point Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 30
Figure 12 Cloud Point Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 31
Figure 13 High Frequency Reciprocating Rig (HFRR) Lubricity Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 32
Figure 14 Scuffing Load Ball On Cylinder Lubricity Evaluator (SOBOCLE) Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 33
Figure 15 Viscosity at 313 K (40oC/104oF) Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 34
Figure 16 Accelerated Stability Response to Direct Blending F-T Diesels into a Future Tier II CARB-Like Diesel Pool 35
Figure 17 F-T Diesel Response to Additive 39
Figure 18 Test Fuel Candidates Passing Lubricity 40
Figure 19 Hot-Start Transient Emissions Results 42
Figure 20 Prediction of Commercial Ethylene Yields for Hydrotreated F-T Naphtha versus Petroleum Naphtha 43
Figure 21 Slurry Concentration with F-T Water 48
Figure 22 Carbon Dioxide Capture from Combustion Turbine Exhaust 51
Figure 23 EECP Catalyst/Wax Separation 52
 
LIST OF TABLES
Table 1 Technical Risks and Design Deficiencies Identified in Phase I 6
Table 2 EECP Phase II - RD&T Work Breakdown Tasks 7
Table 3 Comparison of Low-Btu Gas Test Point Conditions Between Measured and Planned 21
Table 4 Comparison of Low-Btu Gas Fuel Compositions Between Measured and Planned 22
Table 5 Petroleum Coke Characteristics 44
Table 6 Spent F-T Catalyst Disposal 50
Table 7 Feed Streams Entering F-T Synthesis Plant 55
Table 8 Products Streams Leaving F-T Synthesis Plant 56
Table 9 Effluent Streams 56