Return to DOE Report Table of Contents

Return to the Early Entrance Co-Production Plant Table of Contents

Early Entrance Coproduction Plant Phase I - Preliminary Concept Report

Abughazaleh, John S.
Mushtag, Ahmed
Ashok, Anand
John H., Anderson
Benham, Charles
Brent, Fred D.
Chance, Thomas E.
Davis, William K.
Drnevich, Raymond F.
Hall, Larry
He, Ming
Lang, Stephen A.
Mintner, David
Moore, Wendy
Ong, Jimmy O.
Potoczniak, George
Sanchez, Adela G.
 Schrader, Charles H.
Shah, Lalit S.
Sheth, Kalapi D.
Shires, Phil J.
Song, Rae

Texaco Energy Systems

In the pdf format this document is 63 pages and 718kb

Table of Contents

BOOK 1

 

Book Cover

Transmittal Letter

i

Title Page

ii

Disclaimer

iii

Abstract

TFD-1

Table of Contents

ES-1

List of Tables, Figures and Drawings

E-1

Executive Summary

Experimental

Results and Discussion

RD-1

Conclusion

C-1

References

R-1

List of Acronyms

A-1

 

TASK 1

1.0

PROJECT PLAN

1-1

1.1

Project Management Plan

1-1

1.1.1

Work Breakdown Structure

1-1

1.1.2

Schedule and Milestones

1-1

1.1.3

Manning and Project Cash Flow Projections

1-1

1.1.4

DOE Review

1-1

1.1.5

Final Issue

1-2

 
TASK 2
2.0

CONCEPT DEFINITION, DEVELOPMENT, AND TECHNICAL ASSESSMENT

2-1

 

Overview

2-1

2.1

Overall Concept Definition and Development

2-2

2.1.1

Market

2-2

2.1.2

Technical

2-4

2.1.3

Economics/Optimizations

2-7

2.2

Alternative Site Design Options - Assessment and Selection

2-13

2.2.1

Introduction

2-13

2.2.2

Results and Discussion

2-15

2.2.3

Conclusions

2-94

2.3

Design Considerations for Advanced Subsystems

2-98

2.3.1

Fischer-Tropsch Synthesis

2-99

2.3.2

Gas Turbine

2-102

2.3.3

Fischer-Tropsch Product Upgrading

2-105

 
TASK 2 - ATTACHMENTS

2-A

Attachment 2-A; F-T Product Upgrade Options Study

2A-1

2-B

Attachment 2-B; F-T Wastewater Treating/Utilization Study

2B-1

2-C

Attachment 2-C: F-T Feed Gas H2:CO Optimum Ratio Study

2C-1

2-D

Attachment 2-D: F-T Feed Gas Optimum Percent CO2 Study

2D-1

2-E

Attachment 2-E: Acid Gas Removal Selection Study

2E-1

2-F

Attachment 2-F: Evaluation of a Combined Primary and Tail Gas

2F-1

 

Treating Amine System

 
TASK 3

3.0

TECHNICAL ASSESSMENT OF SUBSYSTEMS

3-1

 

Overview

3-1

3.1

Basic Engineering Design Data

3-2

3.2

Air Separation Unit

3-3

3.2.1

Process Arrangement

3-3

3.2.2

Design Basis

3-3

3.3

Gasification

3-9

3.4

Acid Gas Removal

3-11

3.4.1

Stripping Nitrogen

3-11

3.5

Sulfur Recovery Unit/Tail Gas Treating Unit

3-13

3.6

Fischer-Tropsch Synthesis

3-15

3.6.1

Battery Limit Conditions

3-15

3.6.2

Syngas

3-16

3.6.3

Zinc Oxide Bed Design Basis

3-17

3.6.4

Fischer-Tropsch Synthesis Reactor Yields

3-17

3.6.5

Fischer-Tropsch Catalyst Properties

3-17

3.6.6

Catalyst Activation

3-17

3.7

Gas Turbine/Generator

3-18

3.8

Steam System

3-22

3.8.1

Steam System Header Pressure

3-22

3.8.2

Steam Condensate Systems

3-22

3.8.3

Water Systems

3-22

3.9

Fischer-Tropsch Product Upgrading

3-23

3.9.1

Scope of Work

3-23

3.9.2

Feedstock and Product Properties

3-24

3.9.3

Feed Rates and Process Yields

3-29

3.9.4

Hydrogen Make-Up Gas

3-29

3.9.5

Unit Design Basis

3-30

3.9.5.1

Service Factor

3-30

3.9.5.2

Design Considerations

3-30

3.9.6

Battery Limit Conditions

3-31

3.9.7

Unit Turn-Down

3-31

3.10

Off Site

3-31

3.10.1

Purge Nitrogen

3-31

3.10.2

Flare System

3-32

3.10.3

Secondary Fuel Specifications

3-32

3.10.4

Plant and Instrument Air

3-33

3.10.5

Electric Power

3-33

3.10.6

Cooling Water

3-34

3.11

Unit/Equipment Numbering

3-35

 

BOOK 2

TASK 4

4.0

SUBSYSTEM DESIGN SPECIFICATIONS

4-1

 

Overview

4-1

4.1

EECP Concept

4-2

4.1.1

Concept Process Description

4-2

4.1.2

Overall Block Flow Diagrams

4-4

4.1.3

Refinery Integration

4-9

4.1.4

Pinch Analysis

4-10

4.2

Process Description

4-10

4.2.1

Air Separation Unit

4-10

4.2.3

Acid Gas Removal Unit

4-14

4.2.4

Fischer-Tropsch Synthesis

4-15

4.2.6

Power Block

4-20

4.2.7

SRU/TGTU Process Description

4-23

4.2.8

Steam System Process Description

4-24

4.2.9

Off Site

4-25

4.3

Process Flow Sketches

4-26

4.3.1

Air Separation Unit

4-26

4.3.2

Gasification unit

4-26

4.3.3

Acid Gas Removal Unit

4-26

4.3.4

F-T Synthesis Unit

4-26

4.3.5

F-T Upgrading Unit

4-26

4.3.6

Power Block Unit

4-26

4.3.7

Sulfur Recovery Unit/Tail Gas Treating Unit

4-26

4.3.8

Steam System

4-27

4.3.9

Off Site

4-27

4.3.10

Power Distribution Network

4-27

4.4

Stream Summaries

4-50

4.4.1

ASU Stream Summaries

4-50

4.4.2

Gasification

4-51

4.4.3

Acid Gas Removal

4-54

4.4.4

F-T Synthesis

4-54

4.4.5

F-T Upgrading

4-65

4.4.6

Power Block

4-66

4.4.7

SRU/TGTU

4-68

4.5

Equipment List

4-70

4.5.1

ASU

4-70

4.5.2

Gasification

4-70

4.5.3

AGR

4-73

4.5.4

F-T Synthesis

4-74

4.5.5

F-T Product Upgrading Equipment List

4-75

4.5.6

Power Block

4-77

4.5.7

SRU/TGTU

4-77

4.5.8

Steam System Equipment List

4-78

4.5.9

Off Site Equipment List

4-79

4.6

Utility/Catalyst/Chemical Summary

4-80

4.6.1

ASU

4-83

4.6.2

Gasification

4-83

4.6.3

AGR

4-86

4.6.4

F-T Synthesis

4-87

4.6.5

F-T Upgrading

4-91

4.6.6

Power Block

4-92

4.6.7

SRU/TGTU

4-92

4.6.8

Steam System

4-95

4.6.9

Off Site

4-95

4.6.10

Overall Utility Plan

4-95

4.7

Subsystem Plot Plans

4-96

4.7.1

Overall Plot Plan

4-96

4.7.2

Air Separation Unit

4-96

4.7.3

Gasification

4-96

4.7.4

AGR

4-96

4.7.5

F-T Synthesis

4-96

4.7.6

F-T Upgrading

4-96

4.7.7

Power Block

4-96

4.7.8

SRU/TGTU/AGR

4-96

4.8

Technical Barriers

4-105

4.8.1

F-T Synthesis

4-105

4.8.1.1

Reactor Design Concerns

4-106

4.8.2

Power Block

4-112

4.8.3

F-T Product Upgrading

4-112

4.8.4

Technical Barriers - Acid Gas Removal (AGR)

4-118

4.8.5

Risk Assessment

4-119

 

TASK 4 - ATTACHMENTS

4-A

Attachment A: Pinch Analysis

4A-1

4-B

Attachment B; Facilities Reliability Study

4B-1

 

TASK 5

5.0

MARKET ASSESSMENT

5-1

 

Overview

5-1

5.1

Market Analysis of Products

5-1

5.1.1

Diesel

5-1

5.1.2

Finished Waxes

5-3

5.1.3

F-T Naphtha

5-6

5.1.4

Power

5-8

5.1.5

Sulfur

5-9

5.2

Market Assessment of Technology

5-11

5.2.1

Feedstock Availability

5-11

5.2.2

Environmental Factors

5-12

5.2.3

Technology Factors

5-12

5.3

Fischer-Tropsch Product Slate and Analysis

5-15

5.3.1

Diesel

5-15

5.3.2

Naphtha

5-16

5.3.3

Specialty Low and Medium Melt Waxes

5-18

5.3.4

Specialty High Melt Waxes

5-19

5.4

Full-Scale Commercial Plant

5-20

5.4.1

Price and Feedstock Availability

5-20

5.4.2

Proximity to Markets

5-21

5.4.3

Environmental Considerations

5-21

5.4.4

Infrastructure and Process Integration

5-22

 

TASK 6

6.0

PRELIMINARY SITE ANALYSIS

6-1

 

Overview

6-1

6.1

Site Selection Process

6-1

6.1.1

Synergy with Existing Infrastructure

6-1

6.1.2

Construction Requirements

6-1

6.1.3

Site Access

6-4

6.1.4

Environmental Requirements

6-4

6.1.5

Community

6-4

6.1.6

Geotechnical and Topographic Investigation

6-4

6.1.7

Economic Factors

6-4

6.1.8

Site Commitment to Project

6-4

6.2

Identify Specific Sites

6-4

6.3

Identify Additional Commitments/Parties for EECP Participation

6-7

 
TASK 7

7.0

ENVIRONMENTAL ASSESSMENT

7-1

 

Overview

7-1

7.1

Summary

7-1

7.1.1

NEPA Requirements

7-1

7.1.2

Air Permit Requirements

7-1

7.1.3

Wastewater Permit Requirements

7-2

7.1.4

Solid Waste Permit Requirements

7-2

7.2

Emission Levels

7-2

7.3

Adaptability for CO2 Sequestration

7-6

7.3.1

Introduction

7-6

7.3.2

Sequestration Options

7-7

7.3.3

CO2 Sequestration

7-9

7.4

Water Use and Remediation

7-11

7.5

Solid Waste Byproducts

7-11

7.6

NEPA Requirements

7-12

7.7

Permitting Requirements

7-13

7.7.1

Air

7-13

7.7.2

Wastewater

7-16

7.7.3

Solid Waste

7-17

7.8

Integration of Existing Facilities with New Treatment Facilities

7-17

7.8.1

Wastewater Treatment

7-17

7.8.2

Solid Waste Disposal

7-18

 

TASK 8

8.0

ECONOMIC ASSESSMENT

8-1

 

Overview

8-1

8.1

Feedstock Cost and Product Price Evaluation

8-2

8.1.1

Economic Parameters

8-4

8.1.2

Economic Sensitivity Analysis

8-4

8.1.3

Taxes, Royalties, and Inflation

8-4

8.2

Cost Estimates

8-5

8.2.1

Capital Estimates Methodology

8-5

8.2.2

Operating Costs

8-11

8.2.3

Refinery Site Maintenance

8-12

8.3

Role of Government Incentives for Commercial Viability of EECP

8-13

8.3.1

Tax Relief

8-13

8.3.2

Energy Policy Act (EPACT) Alternate Fuels

8-14

8.3.3

Long-Term F-T Liquids Purchase Agreement

8-14

8.3.4

Cost Sharing

8-14