Return to DOE Report Table of Contents - T

Return to the Early Entrance Co-Production Plant Table of Contents

Early Entrance Coproduction Plant Phase II - Task 4.0: Design Basis Update

Benham, Charles
Bohn, Mark
Anderson, John
Berry, Earl
Brent, Fred
He, Ming
Rob, Randy
Shah,  Lalit
Roos, Marjan

Texaco Energy Systems

In the pdf format this document has 25 pages and 205kb

Table of Contents

Disclaimer 2
Abstract 3
Table of Contents 4
List of Graphical Material 5
Executive Summary 6
Background 8
  EECP Concept 8
Design Basis Update 12
Fischer-Tropsch Synthesis Design Basis Update 12
  Battery Limit Conditions 13
Syngas 14
Zinc Oxide Bed Design Basis 15
Fischer-Tropsch Synthesis Reactor Yields 15
Fischer-Tropsch Catalyst Properties 15
Catalyst Activation 16
Fischer Tropsch Product Upgrading Design Basis Update 17
  Feedstock and Product Properties 17
Feed Rates and Process Yields 19
Hydrogen Makeup gas 20
Unit Design Basis 20
Service Factor 20
Design Considerations 20
  Site Conditions 20
Plant Location 20
Typical Meteorological and Plant Data 21
Typical Utilities (ISBL) 21
  Typical Battery Limit Conditions 22
Unit Turndown 22
Conclusions 22
Bibliography 23
List of Acronyms and Abbreviations 24