Return to DOE Report Table of
Contents - T
Return to the Early Entrance Co-Production Plant Table of Contents
Early Entrance Coproduction Plant Phase II - Task 4.0: Design
Basis Update
Benham, Charles
Bohn, Mark
Anderson, John
Berry, Earl
Brent, Fred
He, Ming
Rob, Randy
Shah,
Lalit
Roos,
Marjan
Texaco Energy Systems
In the pdf format this document has
25 pages and 205kb
Table of Contents
Disclaimer |
2 |
Abstract |
3 |
Table of Contents |
4 |
List of Graphical Material |
5 |
Executive Summary |
6 |
Background |
8 |
|
EECP Concept |
8 |
Design Basis Update |
12 |
Fischer-Tropsch Synthesis Design Basis
Update |
12 |
|
Battery Limit Conditions |
13 |
Syngas |
14 |
Zinc Oxide Bed Design Basis |
15 |
Fischer-Tropsch Synthesis Reactor Yields |
15 |
Fischer-Tropsch Catalyst Properties |
15 |
Catalyst Activation |
16 |
Fischer Tropsch Product Upgrading Design
Basis Update |
17 |
|
Feedstock and Product Properties |
17 |
Feed Rates and Process Yields |
19 |
Hydrogen Makeup gas |
20 |
Unit Design Basis |
20 |
Service Factor |
20 |
Design Considerations |
20 |
|
Site Conditions |
20 |
Plant Location |
20 |
Typical Meteorological and Plant Data |
21 |
Typical Utilities (ISBL) |
21 |
|
Typical Battery Limit Conditions |
22 |
Unit Turndown |
22 |
Conclusions |
22 |
Bibliography |
23 |
List of Acronyms and Abbreviations |
24 |
|