BOOK 1 |
|
Book Cover |
Transmittal Letter |
i |
Title Page |
ii |
Disclaimer |
iii |
Abstract |
TFD-1 |
Table of Contents |
ES-1 |
List of Tables, Figures and Drawings |
E-1 |
Executive Summary |
Experimental |
Results and Discussion |
RD-1 |
Conclusion |
C-1 |
References |
R-1 |
List of Acronyms |
A-1 |
|
TASK 1 |
1.0 |
PROJECT PLAN |
1-1 |
1.1 |
Project Management Plan |
1-1 |
1.1.1 |
Work Breakdown Structure |
1-1 |
1.1.2 |
Schedule and Milestones |
1-1 |
1.1.3 |
Manning and Project Cash Flow Projections |
1-1 |
1.1.4 |
DOE Review |
1-1 |
1.1.5 |
Final Issue |
1-2 |
|
TASK 2 |
2.0 |
CONCEPT DEFINITION, DEVELOPMENT, AND TECHNICAL
ASSESSMENT |
2-1 |
|
Overview |
2-1 |
2.1 |
Overall Concept Definition and Development |
2-2 |
2.1.1 |
Market |
2-2 |
2.1.2 |
Technical |
2-4 |
2.1.2.1 |
F-T Product Upgrading Options |
2-4 |
2.1.2.2 |
F-T Catalyst Wax Separation |
2-6 |
2.1.2.3 |
F-T Wastewater Treating/Utilization |
2-6 |
2.1.3 |
Economics/Optimizations |
2-7 |
2.1.3.1 |
F-T Feed Gas H2:CO Optimum Ratio |
2-8 |
2.1.3.2 |
Heat and Process Integration |
2-9 |
2.1.3.3 |
Percent of CO2 in the F-T Feed Gas |
2-10 |
2.1.3.4 |
Acid Gas Removal Scheme |
2-11 |
2.1.3.5 |
F-T Tail Gas Utilization Study |
2-11 |
2.1.3.5.1 |
Reactors in Series |
2-12 |
2.1.3.5.2 |
Recycle to the F-T Reactor |
2-12 |
2.1.3.5.3 |
Recycle to the Syngas Generation Unit |
2-12 |
2.1.3.5.4 |
Fuel for Power Generation |
2-13 |
2.1.3.5.5 |
Other Utilization Options |
2-13 |
2.1.3.5.6 |
EECP Concept - Selected Tail Gas Utilization Concept |
2-13 |
2.2 |
Alternative Site Design Options - Assessment and
Selection |
2-13 |
2.2.1 |
Introduction |
2-13 |
2.2.2 |
Results and Discussion |
2-15 |
2.2.2.1 |
Design Basis |
2-15 |
2.2.2.1.1 |
Design Basis - Product Upgrading Summary |
2-23 |
2.2.2.2 |
Block Flow Diagrams |
2-28 |
2.2.2.3 |
Process Descriptions |
2-33 |
2.2.2.3.1 |
Overall Block Flow Diagram |
2-33 |
2.2.2.3.2 |
Port Arthur Cases - PARHCU and PARFW |
2-33 |
2.2.2.3.3. |
Tampa Electric Polk Station Cases - THCU and TSC |
2-35 |
2.2.2.4 |
Stearn Summaries |
2-37 |
2.2.2.5 |
Equipment List |
2-62 |
2.2.2.6 |
Overall Utility Summaries |
2-74 |
2.2.2.7 |
Heat and Process Integration |
2-79 |
2.2.2.8 |
Acid Gas Removal Options |
2-80 |
2.2.2.9 |
Capital Cost Estimate |
2-81 |
2.2.2.9.1 |
Purpose and Scope |
2-81 |
2.2.2.9.2 |
Approach |
2-82 |
2.2.2.9.3 |
Estimate Structure |
2-82 |
2.2.2.9.4 |
Methodology |
2-83 |
2.2.2.10 |
Environmental Considerations |
2-87 |
2.2.2.11 |
Marketing Considerations |
2-88 |
2.2.2.11.1 |
Plant Site Selection Criteria |
2-88 |
2.2.2.11.2 |
Objectives |
2-88 |
2.2.2.11.3 |
Background Information |
2-88 |
2.2.2.11.4 |
Product Slate Pricing |
2-89 |
2.2.2.11.5 |
Product Valuation Methodologies |
2-90 |
2.2.3 |
Conclusions |
2-94 |
2.3 |
Design Considerations for Advanced Subsystems |
2-98 |
2.3.1 |
Fischer-Tropsch Synthesis |
2-99 |
2.3.2 |
Gas Turbine |
2-102 |
2.3.3 |
Fischer-Tropsch Product Upgrading |
2-105 |
|
TASK 2 - ATTACHMENTS |
2-A |
Attachment 2-A; F-T Product Upgrade Options Study |
2A-1 |
2-B |
Attachment 2-B; F-T Wastewater Treating/Utilization
Study |
2B-1 |
2-C |
Attachment 2-C: F-T Feed Gas H2:CO
Optimum Ratio Study |
2C-1 |
2-D |
Attachment 2-D: F-T Feed Gas Optimum Percent CO2
Study |
2D-1 |
2-E |
Attachment 2-E: Acid Gas Removal Selection Study |
2E-1 |
2-F |
Attachment 2-F: Evaluation of a Combined Primary and
Tail Gas |
2F-1 |
|
Treating Amine System |
|
TASK 3 |
3.0 |
TECHNICAL ASSESSMENT OF SUBSYSTEMS |
3-1 |
|
Overview |
3-1 |
3.1 |
Basic Engineering Design Data |
3-2 |
3.2 |
Air Separation Unit |
3-3 |
3.2.1 |
Process Arrangement |
3-3 |
3.2.2 |
Design Basis |
3-3 |
3.3 |
Gasification |
3-9 |
3.4 |
Acid Gas Removal |
3-11 |
3.4.1 |
Stripping Nitrogen |
3-11 |
3.5 |
Sulfur Recovery Unit/Tail Gas Treating Unit |
3-13 |
3.6 |
Fischer-Tropsch Synthesis |
3-15 |
3.6.1 |
Battery Limit Conditions |
3-15 |
3.6.2 |
Syngas |
3-16 |
3.6.3 |
Zinc Oxide Bed Design Basis |
3-17 |
3.6.4 |
Fischer-Tropsch Synthesis Reactor Yields |
3-17 |
3.6.5 |
Fischer-Tropsch Catalyst Properties |
3-17 |
3.6.6 |
Catalyst Activation |
3-17 |
3.7 |
Gas Turbine/Generator |
3-18 |
3.8 |
Steam System |
3-22 |
3.8.1 |
Steam System Header Pressure |
3-22 |
3.8.2 |
Steam Condensate Systems |
3-22 |
3.8.3 |
Water Systems |
3-22 |
3.9 |
Fischer-Tropsch Product Upgrading |
3-23 |
3.9.1 |
Scope of Work |
3-23 |
3.9.2 |
Feedstock and Product Properties |
3-24 |
3.9.3 |
Feed Rates and Process Yields |
3-29 |
3.9.4 |
Hydrogen Make-Up Gas |
3-29 |
3.9.5 |
Unit Design Basis |
3-30 |
3.9.5.1 |
Service Factor |
3-30 |
3.9.5.2 |
Design Considerations |
3-30 |
3.9.6 |
Battery Limit Conditions |
3-31 |
3.9.7 |
Unit Turn-Down |
3-31 |
3.10 |
Off Site |
3-31 |
3.10.1 |
Purge Nitrogen |
3-31 |
3.10.2 |
Flare System |
3-32 |
3.10.3 |
Secondary Fuel Specifications |
3-32 |
3.10.4 |
Plant and Instrument Air |
3-33 |
3.10.5 |
Electric Power |
3-33 |
3.10.6 |
Cooling Water |
3-34 |
3.11 |
Unit/Equipment Numbering |
3-35 |
|
BOOK 2 |
TASK 4 |
4.0 |
SUBSYSTEM DESIGN SPECIFICATIONS |
4-1 |
|
Overview |
4-1 |
4.1 |
EECP Concept |
4-2 |
4.1.1 |
Concept Process Description |
4-2 |
4.1.2 |
Overall Block Flow Diagrams |
4-4 |
4.1.3 |
Refinery Integration |
4-9 |
4.1.4 |
Pinch Analysis |
4-10 |
4.2 |
Process Description |
4-10 |
4.2.1 |
Air Separation Unit |
4-10 |
4.2.1.1 |
Gas Turbine Extraction Air Supply |
4-11 |
4.2.1.2 |
Main Air Feed Filtration and Compression |
4-11 |
4.2.1.3 |
Air Cooling and Purification |
4-11 |
4.2.1.4 |
Cryogenic Distillation |
4-11 |
4.2.1.5 |
Product Compression |
4-12 |
4.2.2 |
Gasification |
4-12 |
4.2.2.1 |
Coke Handling Unit (U-2000) |
4-12 |
4.2.2.2 |
Slurry Preparation Unit (U-3000) |
4-12 |
4.2.2.3 |
Gasification Unit (U-4000) |
4-13 |
4.2.2.4 |
Coarse Slag Handling Unit (U-5000) |
4-13 |
4.2.2.5 |
Black Water Flash Unit (U-6000) |
4-13 |
4.2.2.6 |
Fines Handling Unit (U-7000) |
4-14 |
4.2.2.7 |
Low Temperature Gas Cooling (U-8000) |
4-14 |
4.2.3 |
Acid Gas Removal Unit |
4-14 |
4.2.4 |
Fischer-Tropsch Synthesis |
4-15 |
4.2.4.1 |
Fischer-Tropsch Reactor |
4-15 |
4.2.4.2 |
F-T Product Separation |
4-15 |
4.2.4.3 |
F-T Reaction Heat Removal System |
4-16 |
4.2.4.4 |
Catalyst Handling System |
4-16 |
4.2.5 |
F-T Upgrading |
4-17 |
4.2.5.1 |
General |
4-17 |
4.2.5.2 |
Description of Flow |
4-18 |
4.2.6 |
Power Block |
4-20 |
4.2.6.1 |
Gas Turbine |
4-21 |
4.2.6.2 |
Steam Turbine |
4-22 |
4.2.6.3 |
Generators |
4-22 |
4.2.6.4 |
Heat Recovery Steam Generator |
4-22 |
4.2.6.5 |
Unit Controls |
4-23 |
4.2.6.6 |
Feedwater System |
4-23 |
4.2.7 |
SRU/TGTU Process Description |
4-23 |
4.2.8 |
Steam System Process Description |
4-24 |
4.2.9 |
Off Site |
4-25 |
4.3 |
Process Flow Sketches |
4-26 |
4.3.1 |
Air Separation Unit |
4-26 |
4.3.2 |
Gasification unit |
4-26 |
4.3.3 |
Acid Gas Removal Unit |
4-26 |
4.3.4 |
F-T Synthesis Unit |
4-26 |
4.3.5 |
F-T Upgrading Unit |
4-26 |
4.3.6 |
Power Block Unit |
4-26 |
4.3.7 |
Sulfur Recovery Unit/Tail Gas Treating Unit |
4-26 |
4.3.8 |
Steam System |
4-27 |
4.3.9 |
Off Site |
4-27 |
4.3.10 |
Power Distribution Network |
4-27 |
4.4 |
Stream Summaries |
4-50 |
4.4.1 |
ASU Stream Summaries |
4-50 |
4.4.2 |
Gasification |
4-51 |
4.4.3 |
Acid Gas Removal |
4-54 |
4.4.4 |
F-T Synthesis |
4-54 |
4.4.5 |
F-T Upgrading |
4-65 |
4.4.6 |
Power Block |
4-66 |
4.4.7 |
SRU/TGTU |
4-68 |
4.5 |
Equipment List |
4-70 |
4.5.1 |
ASU |
4-70 |
4.5.2 |
Gasification |
4-70 |
4.5.3 |
AGR |
4-73 |
4.5.4 |
F-T Synthesis |
4-74 |
4.5.5 |
F-T Product Upgrading Equipment List |
4-75 |
4.5.6 |
Power Block |
4-77 |
4.5.7 |
SRU/TGTU |
4-77 |
4.5.8 |
Steam System Equipment List |
4-78 |
4.5.9 |
Off Site Equipment List |
4-79 |
4.6 |
Utility/Catalyst/Chemical Summary |
4-80 |
4.6.1 |
ASU |
4-83 |
4.6.2 |
Gasification |
4-83 |
4.6.3 |
AGR |
4-86 |
4.6.4 |
F-T Synthesis |
4-87 |
4.6.5 |
F-T Upgrading |
4-91 |
4.6.6 |
Power Block |
4-92 |
4.6.7 |
SRU/TGTU |
4-92 |
4.6.8 |
Steam System |
4-95 |
4.6.9 |
Off Site |
4-95 |
4.6.10 |
Overall Utility Plan |
4-95 |
4.7 |
Subsystem Plot Plans |
4-96 |
4.7.1 |
Overall Plot Plan |
4-96 |
4.7.2 |
Air Separation Unit |
4-96 |
4.7.3 |
Gasification |
4-96 |
4.7.4 |
AGR |
4-96 |
4.7.5 |
F-T Synthesis |
4-96 |
4.7.6 |
F-T Upgrading |
4-96 |
4.7.7 |
Power Block |
4-96 |
4.7.8 |
SRU/TGTU/AGR |
4-96 |
4.8 |
Technical Barriers |
4-105 |
4.8.1 |
F-T Synthesis |
4-105 |
4.8.1.1 |
Reactor Design Concerns |
4-106 |
4.8.1.1.1 |
Confirmation of Catalyst Performance |
4-106 |
4.8.1.1.2 |
Catalyst Replacement Rate |
4-107 |
4.8.1.1.3 |
Water Gas Shift Activity |
4-107 |
4.8.1.1.4 |
Hydrodynamics |
4-107 |
4.8.1.1.5 |
Scale-Up |
4-108 |
4.8.1.1.6 |
Design of Reactor Internals |
4-109 |
4.8.1.2 |
Catalyst/Wax Separation |
4-109 |
4.8.1.2.1 |
Rentech Primary Separation |
4-109 |
4.8.1.2.2 |
Rentech Second Stage Separation |
4-110 |
4.8.1.3 |
Equipment Design |
4-110 |
4.8.1.4 |
Environmental |
4-111 |
4.8.1.4.1 |
F-T Tail Gas Utilization |
4-111 |
4.8.1.4.2 |
Disposal of Catalyst |
4-111 |
4.8.1.4.3 |
F-T Water Usage |
4-112 |
4.8.2 |
Power Block |
4-112 |
4.8.3 |
F-T Product Upgrading |
4-112 |
4.8.3.1 |
Hy-Finishing Technology |
4-114 |
4.8.3.1.1 |
Olefins and Oxygenates |
4-115 |
4.8.3.1.2 |
Yields and Properties |
4-115 |
4.8.3.1.3 |
Thermal Degradation |
4-115 |
4.8.3.1.4 |
Iron Contamination |
4-116 |
4.8.3.1.5 |
Zero Sulfur |
4-116 |
4.8.3.2 |
Conclusion |
4-117 |
4.8.4 |
Technical Barriers - Acid Gas Removal (AGR) |
4-118 |
4.8.5 |
Risk Assessment |
4-119 |
4.8.5.1 |
Case A: Total EECP Facility |
4-120 |
4.8.5.2 |
Case B: EECP System Excluding Units 10000 and 11000 |
4-120 |
4.8.5.3 |
Case C: Power Island Only |
4-121 |
4.8.5.4 |
Case A-1: Spared Compressors in Unit 1100 |
4-122 |
4.8.5.5 |
Conclusions and Recommendations |
4-122 |
|
TASK 4 - ATTACHMENTS |
4-A |
Attachment A: Pinch Analysis |
4A-1 |
4-B |
Attachment B; Facilities Reliability Study |
4B-1 |
|
TASK 5 |
5.0 |
MARKET ASSESSMENT |
5-1 |
|
Overview |
5-1 |
5.1 |
Market Analysis of Products |
5-1 |
5.1.1 |
Diesel |
5-1 |
5.1.1.1 |
Current Market Size |
5-1 |
5.1.1.2 |
Supply and Demand |
5-2 |
5.1.1.3 |
Projected 10-Year Growth Rates |
5-2 |
5.1.1.4 |
Current Prices |
5-2 |
5.1.1.5 |
Projected 10-Year Prices |
5-3 |
5.1.1.6 |
Projected New Markets |
5-3 |
5.1.2 |
Finished Waxes |
5-3 |
5.1.2.1 |
Current Market Size |
5-4 |
5.1.2.2 |
Supply and Demand |
5-4 |
5.1.2.3 |
Projected 10-Year Growth Rates |
5-4 |
5.1.2.4 |
Current Prices |
5-4 |
5.1.2.5 |
Projected 10-Year Prices |
5-5 |
5.1.2.6 |
Projected New Markets |
5-5 |
5.1.3 |
F-T Naptha |
5-6 |
5.1.3.1 |
Current Market Size |
5-6 |
5.1.3.2 |
Supply and Demand |
5-6 |
5.1.3.3 |
Projected 10-Year Growth Rates |
5-6 |
5.1.3.4 |
Current Prices |
5-7 |
5.1.3.5 |
Projected 10-Year Prices |
5-7 |
5.1.3.6 |
Projected New Markets |
5-8 |
5.1.4 |
Power |
5-8 |
5.1.4.1 |
Current Market Size |
5-8 |
5.1.4.2 |
Supply and Demand |
5-8 |
5.1.4.3 |
Projected 10-Year Growth Rates |
5-8 |
5.1.4.4 |
EECP Electrical Power Price |
5-9 |
5.1.5 |
Sulfur |
5-9 |
5.1.5.1 |
Current Market Size |
5-9 |
5.1.5.2 |
Supply and Demand |
5-9 |
5.1.5.3 |
Projected 10-Year Growth Rates |
5-10 |
5.1.5.4 |
Current Prices |
5-10 |
5.1.5.5 |
Projected 10-Year Prices |
5-10 |
5.1.5.6 |
Projected New Markets |
5-11 |
5.2 |
Market Assessment of Technology |
5-11 |
5.2.1 |
Feedstock Availability |
5-11 |
5.2.2 |
Environmental Factors |
5-12 |
5.2.3 |
Technology Factors |
5-12 |
5.3 |
Fischer-Tropsch Product Slate and Analysis |
5-15 |
5.3.1 |
Diesel |
5-15 |
5.3.2 |
Naptha |
5-16 |
5.3.3 |
Specialty Low and Medium Melt Waxes |
5-18 |
5.3.4 |
Specialty High Melt Waxes |
5-19 |
5.4 |
Full-Scale Commercial Plant |
5-20 |
5.4.1 |
Price and Feedstock Availability |
5-20 |
5.4.2 |
Proximity to Markets |
5-21 |
5.4.3 |
Environmental Considerations |
5-21 |
5.4.4 |
Infrastructure and Process Integration |
5-22 |
|
TASK 6 |
6.0 |
PRELIMINARY SITE ANALYSIS |
6-1 |
|
Overview |
6-1 |
6.1 |
Site Selection Process |
6-1 |
6.1.1 |
Synergy with Existing Infrastructure |
6-1 |
6.1.2 |
Construction Requirements |
6-1 |
6.1.3 |
Site Access |
6-4 |
6.1.4 |
Environmental Requirements |
6-4 |
6.1.5 |
Community |
6-4 |
6.1.6 |
Geotechnic and Topographic Investigation |
6-4 |
6.1.7 |
Economic Factors |
6-4 |
6.1.8 |
Site Commitment to Project |
6-4 |
6.2 |
Identify Specific Sites |
6-4 |
6.3 |
Identify Additional Commitments/Parties for EECP
Participation |
6-7 |
|
TASK 7 |
7.0 |
ENVIRONMENTAL ASSESSMENT |
7-1 |
|
Overview |
7-1 |
7.1 |
Summary |
7-1 |
7.1.1 |
NEPA Requirements |
7-1 |
7.1.2 |
Air Permit Requirements |
7-1 |
7.1.3 |
Wastewater Permit Requirements |
7-2 |
7.1.4 |
Solid Waste Permit Requirements |
7-2 |
7.2 |
Emission Levels |
7-2 |
7.3 |
Adaptability for CO2 Sequestration |
7-6 |
7.3.1 |
Introduction |
7-6 |
7.3.1.1 |
CO2 Emissions for EECP Phase I Project |
7-6 |
7.3.1.2 |
EECP Adaptability for CO2 Sequestration |
7-6 |
7.3.2 |
Sequestration Options |
7-7 |
7.3.2.1 |
Membrane Contactor |
7-7 |
7.3.2.2 |
Kerr-McGee/ABB Lummus CO2 Recovery
Technology |
7-7 |
7.3.2.3 |
Mitsubishi Heavy Industries, Ltd. Technology |
7-8 |
7.3.2.4 |
Membranes |
7-8 |
7.3.2.5 |
Carbon Fiber Composite Molecular Sieve |
7-8 |
7.3.2.6 |
Others |
7-8 |
7.3.3 |
CO2 Sequestration |
7-9 |
7.3.3.1 |
Chemical Utilization of CO2 |
7-9 |
7.3.3.2 |
Enhanced Oil Recovery |
7-9 |
7.3.3.3 |
CO2 Storage |
7-9 |
7.3.3.4 |
Advanced Concepts |
7-10 |
7.3.3.5 |
Forestation |
7-10 |
7.4 |
Water Use and Remediation |
7-11 |
7.5 |
Solid Waste Byproducts |
7-11 |
7.6 |
NEPA Requirements |
7-12 |
7.7 |
Permitting Requirements |
7-13 |
7.7.1 |
Air |
7-13 |
7.7.1.1 |
Permit to Construct |
7-13 |
7.7.1.2 |
Non-Attainment Review |
7-14 |
7.7.1.3 |
Prevention of Significant Deterioration Review |
7-16 |
7.7.2 |
Wastewater |
7-16 |
7.7.3 |
Solid Waste |
7-17 |
7.7.3.1 |
Non-Hazardous Wastes |
7-17 |
7.7.3.2 |
Hazardous Wastes |
7-17 |
7.8 |
Integration of Existing Facilities with New
Treatment Facilities |
7-17 |
7.8.1 |
Wastewater Treatment |
7-17 |
7.8.2 |
Solid Waste Disposal |
7-18 |
|
TASK 8 |
8.0 |
ECONOMIC ASSESSMENT |
8-1 |
|
Overview |
8-1 |
8.1 |
Feedstock Cost and Product Price Evaluation |
8-2 |
8.1.1 |
Economic Parameters |
8-4 |
8.1.2 |
Economic Sensitivity Analysis |
8-4 |
8.1.3 |
Taxes, Royalties, and Inflation |
8-4 |
8.2 |
Cost Estimates |
8-5 |
8.2.1 |
Capital Estimates Methodology |
8-5 |
8.2.2 |
Operating Costs |
8-11 |
8.2.3 |
Refinery Site Maintenance |
8-12 |
8.3 |
Role of Government Incentives for Commercial
Viability of EECP |
8-13 |
8.3.1 |
Tax Relief |
8-13 |
8.3.2 |
Energy Policy Act (EPACT) Alternate Fuels |
8-14 |
8.3.3 |
Long-Term F-T Liquids Purchase Agreement |
8-14 |
8.3.4 |
Cost Sharing |
8-14 |