Part 1,
Pages i - 70, 3.64 MB |
1.0 |
Executive Summary |
10 |
1.1 |
Background |
10 |
1.2 |
Slipstream Project Description |
11 |
1.3 |
Slipstream Test Objectives |
12 |
1.4 |
Results |
13 |
1.5 |
Conclusions and Technical Insights |
15 |
2.0 |
Introduction |
17 |
2.1 |
Overview of the Wabash River Gasification Facility |
17 |
2.2 |
Wabash River Gasification Facility Operating History |
18 |
2.3 |
Hot Gas Filter Startup and Operating History |
18 |
2.4 |
Slipstream Program Objectives |
22 |
2.5 |
Slipstream Test Program |
23 |
2.5.1 |
Test Objectives |
23 |
2.5.2 |
Basis for Test Selection and Prioritization |
25 |
2.5.3 |
Test Evaluation Methods |
26 |
2.5.4 |
Standard Operating Procedures |
27 |
2.5.5 |
Test Matrix |
27 |
3.0 |
Project Description |
29 |
3.1 |
Project Overview |
29 |
3.2 |
Process Overview |
30 |
3.3 |
Filter Vessel |
32 |
3.4 |
Blowback System |
34 |
3.5 |
Char Transfer System |
34 |
3.6 |
Backup Filter |
35 |
3.7 |
Controls and Data Acquisition |
35 |
4.0 |
Results |
36 |
4.1 |
Test Methodology |
36 |
4.1.1 |
Filter Blinding Life Predictions |
36 |
4.1.2 |
Filter Efficiency |
37 |
4.1.3 |
Isokinetic Gas Sampling |
37 |
4.1.4 |
Filter Reliability |
37 |
|
4.1.5 |
Corrosion Studies |
38 |
4.2 |
Operating Summary |
38 |
4.2.1 |
Cold Flow Testing |
38 |
4.2.2 |
Test Campaign 1 (11/25 – 11/26/97) |
40 |
4.2.3 |
Test Campaign 2 (2/10/98) |
40 |
4.2.4 |
Test Campaign 3 (3/12 – 3/23/98) |
41 |
4.2.5 |
Test Campaign 4 (3/31 – 4/28/98) |
45 |
4.2.6 |
Test Campaign 5 (6/14 – 6/27/98) |
48 |
4.2.7 |
Test Campaign 6 (8/17 – 10/11/98) |
51 |
4.2.8 |
Test Campaign 7 (10/17 – 11/5/98) |
55 |
4.2.9 |
Test Campaign 8 (1/12 – 1/19/99) |
58 |
4.2.10 |
Test Campaign 9 (2/15 – 2/25/99) |
61 |
4.2.11 |
Test Campaign 10 (6/28 – 7/10/99) |
64 |
4.2.12 |
Test Campaign 11 (8/13 – 8/14/99) |
67 |
4.2.13 |
Test Campaign 12 (8/22 – 9/3/99) |
68 |
Part 2, Pages 71 - 114, 3.77 MB |
|
|
4.2.14 |
Test Campaign 13 (9/14 – 9/28/99) |
71 |
4.2.15 |
Test Campaign 14 (9/9 – 9/13/00) |
74 |
4.2.16 |
Test Campaign 15 (12/11/00) |
77 |
4.2.17 |
Test Campaign 16 (3/7 – 4/3/01) |
77 |
4.2.18 |
Test Campaign 17 (7/14 – 7/21/01) |
81 |
4.2.19 |
Test Campaign 18 (3/10 – 3/11/03) |
84 |
5.0 |
Conclusions and Technical Insights |
85 |
5.1 |
Slipstream Validation |
85 |
5.2 |
Fail-Safe Development |
85 |
5.3 |
Filter Development |
85 |
5.3.1 |
Metallic Filters |
86 |
5.3.2 |
Ceramic Filters |
89 |
5.4 |
Isokinetic Sampling |
90 |
5.5 |
Filter Hardware Configurations |
90 |
6.0 |
Recommendations |
92 |
APPENDICES |
I |
Original Proposed Slipstream Test Matrix |
97 |
II |
Characterization of Field-Exposed Iron Aluminide Hot Gas Filter |
99 |