1 |
Introduction (62.3kb) |
1-1 |
| |
| 2 |
Summary and Discussion (1.59MB) |
2-1 |
| |
| 3 |
Basis for Design (204kb) |
3-1 |
| |
| 4 |
Material and Energy Balances
(552kb) |
4-1 |
| |
H-Coal Case HE - Illinois Coal |
4-1 |
| H-Coal Case HW - Wydoak Coal |
4-7 |
| Lurgi Methanol Case CM - Illinois Coal |
4-12 |
| |
| 5 |
Plant Description - Case HE
(4.34MB) |
5-1 |
| |
General |
5-1 |
| List of Process Units and Section |
5-2 |
| Unit 100 - Coal Preparation |
5-5 |
| Unit 200 - Coal Liquefaction |
5-14 |
| Unit 300 - Light Ends Processing |
5-59 |
| Unit 400 - Hydrogen Plant |
5-66 |
| Unit 500 - Oxygen Plant |
5-77 |
| Unit 600 - Emission Control |
5-80 |
| Unit 700 - Effluent Control |
5-80 |
| Unit 800 - Tank Storage |
5-90 |
| Unit 900 - Refrigeration |
5-93 |
| Unit 1000 - Power Generation |
5-93 |
| Unit 1100 - Cooling Water System |
5-99 |
| Unit 1200 - Utility and Steam Summary |
5-99 |
| Unit 1300 - Water Management |
5-103 |
| Unit 1400 - Flare System |
5-107 |
| Unit 1500 - Buildings |
5-108 |
| Unit 1600 - Common Facilities |
5-109 |
| |
| 6 |
Plant Description - Case HW
(3.01MB) |
6-1 |
| |
General |
6-1 |
| List of Process Units and Section |
6-1 |
| Unit 100 - Coal Preparation |
6-5 |
| Unit 200 - Coal Liquefaction |
6-14 |
| Unit 300 - Light Ends Processing |
6-50 |
| Unit 400 - Hydrogen Plant |
6-54 |
| Unit 500 - Oxygen Plant |
6-69 |
| Unit 600 - Emission Control |
6-72 |
| Unit 700 - Effluent Control |
6-76 |
| Unit 800 - Tank Storage |
6-80 |
| Unit 900 - Refrigeration |
6-83 |
| Unit 1000 - Power Generation |
6-85 |
| Unit 1100 - Cooling Water Systems |
6-85 |
| Unit 1200 - Utility and Steam Summary |
6-89 |
| Unit 1300 - Water Management |
6-93 |
| Unit 1400 - Flare System |
6-97 |
| Unit 1500 - Buildings |
6-97 |
| Unit 1600 - Common Facilities |
6-98 |
| |
| 7 |
Plant Description - Case cm (1.4MB) |
7-1 |
| |
General |
7-1 |
| List of Process Areas |
7-2 |
| Overall Materials Balance |
7-5 |
| Overall Utility Balance |
7-8 |
| Area 100 - Coal Preparation |
7-10 |
| Area 200 - Slurry Preparation |
7-10 |
| Area 300 - Air Separation Plant |
7-14 |
| Area 400 - Coal Gasification |
7-14 |
| Area 500 - CO Shift and Heat Recovery |
7-19 |
| Area 600 - Acid Gas Removal (Rectisol) |
7-24 |
| Area 700 - Sulfur Recovery (Claus) |
7-24 |
| Area 800 - Tail Gas Treating (SCOT) |
7-25 |
| Area 900 - Methanol Synthesis |
7-25 |
| Area 1000 - Power Generation |
7-30 |
| Area 1100 - Cooling Water System |
7-35 |
| Area 1200 - Tank Storage |
7-35 |
| Area 1300 - Water Management |
7-37 |
| Area 1400 - Flare System |
7-41 |
| Area 1500 - Buildings |
7-41 |
| Area 1600 - Common Facilities |
7-41 |
| |
| 8 |
Capital Cost Estimates and Economic
Analysis (824kb) |
8-1 |
| |
Introduction |
8-1 |
| Project Capital and Operating Cost Estimating Bases |
8-3 |
| Capital Cost Estimates |
8-14 |
| Plant Operating Costs |
8-22 |
| Productions Costs |
8-26 |
| |
|
Appendix (1.65MB) |
A-1 |