Return to Department of
Energy Reports Table of Contents A-H
Return to Advanced
Hot Gas Filter Development Reports Table of Contents
Advanced Hot Gas Filter Development
Final
Report - September 29, 1994 to March 31, 1998
Connolly, E. S.
Forsythe, G. D.
Allied Signal
Composites, Inc.
Part 1, Pages 1 - 66, 4.55 MB
Part 2, Pages 67 -
117, 3.78 MB
Table of Contents
Part 1, Pages 1 - 66.pdf |
1. |
Executive Summary |
1 |
2. |
Introduction |
2 |
3. |
Technical Results and Discussion |
5 |
3.1 |
Background Technology |
5 |
3.2 |
Material Qualification (Subtask 3.1) |
7 |
3.2.1 |
Improving the Surface Membrane |
8 |
3.2.2 |
Development of a Dual Membrane Candle Filter |
10 |
3.2.3 |
Mechanical Testing |
12 |
3.2.4 |
Strengthened Flanges |
15 |
3.2.5 |
Filtration and Permeability Testing |
17 |
3.3 |
Field Testing of “Baseline” PRD-66 Filter Elements |
19 |
3.3.1 |
Tidd Test Segment 4 |
19 |
3.3.2 |
Tidd Test Segment 5 |
20 |
3.3.3 |
Analysis of Field Exposed Elements (Subtask 3.4) |
20 |
3.4 |
Development of High Efficiency Membranes |
29 |
3.5 |
Manufacturing Hot Gas Filters (Task 4) |
33 |
3.5.1 |
Raw Materials Plan (Subtask 4.1) |
33 |
3.5.2 |
Process Instrumentation (Subtask 4.2) |
33 |
3.5.3 |
Process Variables Experiments (Subtask 4.3) |
34 |
3.5.4 |
Process Capability Demonstration (Subtask 4.4) |
40 |
3.5.5 |
Equipment Analysis and Improvement (Subtask 4.5) |
45 |
3.6 |
Field Testing of “Improved” PRD-66 Filter Elements |
47 |
3.6.1 |
High Temperature High Pressure (HTHP) Testing at W-STC |
47 |
3.6.2 |
PCFBC Exposure at Karhula |
53 |
Part 2, Pages 67 - 117.pdf |
4. |
Conclusions |
67 |
5. |
Recommendations |
70 |
6. |
Acknowledgements |
71 |
7. |
References |
72 |
Appendix A |
A-1 |
Appendix B |
B-1 |
|