Return to DOE Report Table of Contents
Return to Experimental Studies of
Multiple Steady States in an Adiabatic Coal Liquefaction Reactor Table of
Contents
An Experimental Study of Multiple Steady States in an
Adiabatic Coal Liquefaction Reactor.
Final Report - 1983
Bhattacharjee, S.
McMahon, M.
Shah, Y. T.
Tierney, J. W.
University of Pittsburgh
In the pdf format this document
has 53 pages and is 1.5MB
Table of Contents
1 |
Introduction |
1 |
2 |
Reactor Design |
2 |
3 |
Process Flow Diagram |
6 |
4 |
Data Acquisition and Control |
8 |
5 |
Fischer-Tropsch Reaction |
9 |
6 |
Experimental Procedure |
13 |
7 |
Preliminary Runs to Evaluate Adiabatic Operations |
16 |
8 |
Preliminary Runs to Evaluate the Thermal Requirement for
F-T Reaction |
22 |
9 |
Conversion of Carbon Monoxide and Hydrogen |
27 |
10 |
Conclusions and Recommendations |
35 |
|
Bibliography |
36 |
Appendix: Reactor Digital Control System |
37 |
List of Tables
1 |
Typical properties of the ammonia synthesis catalyst |
11 |
2 |
Typical properties of the liquid carrier used for
Fischer-Tropsch reaction |
12 |
3 |
Table of Q' vs. dT/dt under different conditions |
24 |
4 |
Reaction conditions for F-T reaction |
32 |
5 |
Thermal effect of F-T reaction with Q' = 2.5W |
33 |
6 |
Thermal effect of F-T reaction with Q' = 0 |
34 |
List of Figures
1 |
Cross section of adiabatic container for slurry reactor |
3 |
2 |
Position of the thermocouple around the reactor body and
the coppyer vessel |
5 |
3 |
Process flow diagram |
7 |
4 |
Sample gas chromatogram |
15 |
5 |
Temperature response of the reactor for Q' = 0 |
18 |
6 |
Temperature response of the reactor for Q' = 5W |
19 |
7 |
Temperature response of the reactor for Q' - 10W |
20 |
8 |
Plot of Q' versus dT/dt for diabatic runs |
21 |
9 |
Thermal effect of F-T reactor with Q' = 2.5W |
25 |
10 |
Thermal effect of F-T reactor with Q' = 0 |
26 |
11 |
Conversion of carbon monoxide (set 1) |
28 |
12 |
Conversion of hydrogen (set 2) |
29 |
13 |
Conversion of carbon monoxide (set 2) |
31 |
14 |
Conversion of hydrogen (set 2) |
31 |
A-1 |
Synchronous Portion (Main) |
41 |
A-2 |
Asynchronous Portion |
42 |
A-3 |
Subroutine Job 1 |
43 |
A-4 |
Subroutine Job 3 |
44 |
A-5 |
Subroutine Job 4 |
45 |
A-6 |
Subroutine Job 5 |
46 |
A-7 |
Subroutine Job 6 |
47 |
|