1.0 |
Introduction
|
1 |
2.0 |
Objective
|
2 |
3.0 |
Summary and Conclusions
|
2 |
|
3.1 |
Task 1 - Project Work Plan
|
2 |
3.2 |
Task 2 - Slurry Catalyst Development
|
2 |
|
3.2.1 |
Sub-Task 2a - Background Studies
|
3 |
3.2.2 |
Sub-Task 2b - Bench Scale Reactor Set-Up
|
3 |
3.2.3 |
Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Testing
|
3 |
3.2.4 |
Sub-Task 2d - Metal Cluster Preparation and
Screening Tests
|
3 |
3.3 |
Task 3 - Slurry Reactor Design Studies
|
3 |
4.0 |
Acknowledgments
|
4 |
5.0 |
Results and Discussion
|
4 |
|
5.1 |
Task 1 - Project Work Plan
|
4 |
5.2 |
Task 2 - Slurry Catalyst Development
|
4 |
|
5.2.1 |
Sub-Task 2a - Background Studies
|
4 |
5.2.2 |
Sub-Task 2b - Bench Scale Reactor Set-Up
|
5 |
5.2.3 |
Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Testing
|
6 |
5.2.4 |
Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests
|
6 |
5.3 |
Task 3 - Slurry Reactor Design Studies
|
6 |
|
5.3.1 |
5" Cold Flow Simulator
|
6 |
5.3.2 |
12" Cold Flow Simulator
|
11 |
6.0 |
Experimental
|
11 |
|
6.1 |
Task 1 - Project Work Plan
|
11 |
6.2 |
Task 2 - Slurry Catalyst Development
|
11 |
|
6.2.1 |
Sub-Task 2a - Background Studies
|
11 |
6.2.2 |
Sub-Task 2b - Bench Scale Reactor Set-Up
|
11 |
6.2.3 |
Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests
|
12 |
6.2.4 |
Sub-Task 2d - Cluster Catalyst Preparation and
Screening Tests
|
12 |
6.3 |
Task 3 - Slurry Reactor Design Studies
|
12 |
|
6.3.1 |
5" Cold Flow Simulator
|
12 |
7.0 |
References
|
13 |
8.0 |
Figures
|
14 |
9.0 |
Tables
|
25 |