| 1.0 | 
      
  Introduction 
       | 
      1 | 
    
    
      | 2.0 | 
      
  Objective 
       | 
      2 | 
    
    
      | 3.0 | 
      
  Summary and Conclusions 
       | 
      2 | 
    
    
      |   | 
      3.1 | 
      
  Task 1 - Project Work Plan 
       | 
      2 | 
    
    
      | 3.2 | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      3 | 
    
    
      |   | 
      3.2.1 | 
      
 Sub-Task 2a - Background Studies 
       | 
      3 | 
    
    
      | 3.2.2 | 
      
 Sub-Task 2b - Bench Scale Reactor Set-up 
       | 
      3 | 
    
    
      | 3.2.3 | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      3 | 
    
    
      | 3.2.4 | 
      
 Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      3 | 
    
    
      | 
		 3.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      3 | 
    
    
      | 4.0 | 
      
  Acknowledgements 
       | 
      4 | 
    
    
      | 5.0 | 
      
  Results and Discussion 
       | 
      4 | 
    
    
      |   | 
      5.1 | 
      
  Task 1 - Project Work Plan 
       | 
      4 | 
    
    
      | 5.2 | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      4 | 
    
    
      |   | 
      5.2.1 | 
      
 Sub-Task 2a - Background Studies 
       | 
      4 | 
    
    
      | 5.2.2 | 
      
 Sub-Task 2b - Bench Scale Reactor Set-Up 
       | 
      5 | 
    
    
      | 5.2.3 | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      5 | 
    
    
      | 5.2.4 | 
      
 Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      5 | 
    
    
      | 
		 5.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      5 | 
    
    
      |   | 
      5.3.1 | 
      
 5" Cold Flow Simulator 
       | 
      5 | 
    
    
      | 5.3.2 | 
      
 12" Cold Flow Simulator 
       | 
      9 | 
    
    
      | 
		 6.0  | 
      
  Experimental 
       | 
      9 | 
    
    
      |   | 
      
		 6.1  | 
      
  Task 1 - Project Work Plant 
       | 
      9 | 
    
    
      | 
		 6.2  | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      10 | 
    
    
      |   | 
      6.2.1 | 
      
 Sub-Task 2a - Background Studies 
       | 
      10 | 
    
    
      | 6.2.2 | 
      
 Sub-Task 2b - Bench Scale Reactor Set-Up 
       | 
      10 | 
    
    
      | 6.2.3 | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      11 | 
    
    
      | 6.2.4 | 
      
 Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      11 | 
    
    
      | 
		 6.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      11 | 
    
    
       | 
      
		 6.3.1  | 
      
 5" Cold Flow Simulator 
       | 
      11 | 
    
    
      | 7.0 | 
      
  References 
       | 
      11 | 
    
    
      | 8.0 | 
      
  Figures 
       | 
      13 | 
    
    
      | 9.0 | 
      
  Tables 
       | 
      43 |