Report 
        565kb | 
      
		 1.0  | 
      
  Introduction 
       | 
      1 | 
    
    
      | 
		 2.0  | 
      
  Objective 
       | 
      2 | 
    
    
      | 
		 3.0  | 
      
  Summary and Conclusions 
       | 
      3 | 
    
    
      |   | 
      
		 3.1  | 
      
  Task 1 - Project Work Plan 
       | 
      3 | 
    
    
      | 
		 3.2  | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      3 | 
    
    
      |   | 
      
		 3.2.1  | 
      
 Sub-Task 2a - Background Studies 
       | 
      3 | 
    
    
      | 
		 3.2.2  | 
      
 Sub-Task 2b - Bench Scale Reactor Set-Up 
       | 
      3 | 
    
    
      | 
		 3.2.3  | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      3 | 
    
    
      | 
		 3.2.4  | 
      
 Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      4 | 
    
    
      | 
		 3.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      4 | 
    
    
      | 
		 4.0  | 
      
  Acknowledgments 
       | 
      5 | 
    
    
      | 
		 5.0  | 
      
  Results and Discussion 
       | 
      5 | 
    
    
      |   | 
      
		 5.1  | 
      
  Task 1 - Project Work Plan 
       | 
      5 | 
    
    
      | 
		 5.2  | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      5 | 
    
    
      |   | 
      
		 5.2.1  | 
      
 Sub-Task 2a - Background Studies 
       | 
      5 | 
    
    
      | 
		 5.2.2  | 
      
 Sub-Task 2b - Bench Scale Reactor Set-Up 
       | 
      6 | 
    
    
      | 
		 5.2.3  | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      6 | 
    
    
      | 
		 5.2.4  | 
      
  Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      9 | 
    
    
      | 
		 5.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      9 | 
    
    
      |   | 
      5.3.1 | 
      
 5" Cold Flow Simulator 
       | 
      9 | 
    
    
      | 5.3.2 | 
      
 12" Cold Flow Simulator 
       | 
      11 | 
    
    
      | 
		 6.0  | 
      
  Experimental 
       | 
      12 | 
    
    
      |   | 
      
		 6.1  | 
      
  Task 1 - Project Work Plan 
       | 
      12 | 
    
    
      | 
		 6.2  | 
      
  Task 2 - Slurry Catalyst Development 
       | 
      12 | 
    
    
      |   | 
      
		 6.2.1  | 
      
 Sub-Task 2a - Background Studies 
       | 
      12 | 
    
    
      | 
		 6.2.2  | 
      
 Sub-Task 2b - Bench Scale Reactor Set-Up 
       | 
      12 | 
    
    
      | 
		 6.2.3  | 
      
 Sub-Task 2c - Catalyst Preparation and Slurry
Reactor Tests 
       | 
      13 | 
    
    
      | 
		 6.2.4  | 
      
 Sub-Task 2d - Metal Cluster Catalyst Preparation and
Screening Tests 
       | 
      14 | 
    
    
      | 
		 6.3  | 
      
  Task 3 - Slurry Reactor Design Studies 
       | 
      14 | 
    
    
       | 
      
		 6.3.1  | 
      
 5" Cold Flow Simulator 
       | 
      14 | 
    
    
      | 
		 7.0  | 
      
  References 
       | 
      16 | 
    
    
      | 
		 8.0  | 
      
   Figures 
       | 
      17 | 
    
    
      | 
		 9.0  | 
      
   Tables 
       | 
      40 | 
    
    
      | 
		 10.0  | 
      
   Appendix 
       | 
      61 |