Table of Contents

1.0 Introduction 1
2.0 Objective 2
3.0 Summary and Conclusions 3
  3.1 Task 1 - Project Work Plan 3
3.2 Task 2 - Slurry Catalyst Development 3
  3.2.1 Sub-Task 2a - Background Studies 3
3.2.2 Sub-Task 2b - Bench Scale Reactor Set Up 3
3.2.3 Sub-Task 2c - Catalyst Preparation and Slurry 4
3.2.4 Sub-Task 2d - Metal Cluster Preparation and Screening Tests 4

3.3

Task 3 Slurry Reactor Design Studies 4
4.0 Acknowledgements 4
5.0 Results and Discussion 5
  5.1  Task 1 - Project Work Plan 5
5.2  Task 2 - Slurry Catalyst Development 5
 

5.2.1

Sub-Task 2a - Background Studies 5

5.2.2

 Sub-Task 2b - Bench Scale Reactor Set Up 5

5.2.3

Sub-Task 2c - Catalyst Preparation and Slurry Reactor Tests 5

5.2.4

 Sub-Task 2d - Metal Cluster Catalyst Preparation and Screening Tests 5
(a) Data Processing Program for Cluster Catalyst Screening Tests 6

5.3

 Task 3 - Slurry Reactor Design Studies 6

5.3.1

 5" Cold Flow Simulator 6

6.0

 Experimental 6
 

6.1

Task 1 - Project Work Plan 8

6.2

Task 2 - Slurry Catalyst Development 8
 

6.2.1

Sub-Task 2a - Background Studies 8

6.2.2

Sub-Task 2b - Bench Scale Reactor Set Up 8
  (a) Slurry Reactors 8
(b) Data Processing 8

6.2.3

Sub-Task 2c - Catalyst Preparation and Slurry Reactor Testing 11

6.2.4

Sub-Task 2d - Metal Cluster Catalyst Preparation and Screening Tests 11
(a) Data Processing Program for Cluster Catalyst Screening Tests 11

6.3

Task 3 - Slurry Reactor Desing Studies 11

6.3.1

 5" Cold Flow Simulator 12

7.0

References 14

8.0

Figures 15

9.0

Tables 18