1. |
Forward |
i |
2. |
Legal Notice/Disclaimer |
ii |
3. |
Table of Contents |
iii |
4. |
Summary |
1 |
5. |
TOMS CREEK GASIFICATION PLANT DESIGN |
1 |
5.1 |
Site Location and Conditions |
1 |
5.2 |
Coal, Coke and Sorbent Specification |
2 |
5.2.1 |
Design Coal |
2 |
5.2.2 |
Metallurgical Coke |
4 |
5.2.3 |
Sorbent |
4 |
5.2.4 |
Metal Oxide Sorbent |
4 |
5.3 |
Scope of Plant System |
4 |
5.3.1 |
Power Plant Configuration |
4 |
5.3.2 |
Scope of the Gasification Plant |
5 |
5.3.3 |
Battery Limits of the Gasification Island |
6 |
5.3.4 |
Balance of Plant Systems |
6 |
6. |
PROCESS DESCRIPTION AND HEAT AND MATERIAL BALANCES |
6 |
6.1 |
Process Description |
6 |
6.2 |
Heat and Material Balances |
8 |
6.3 |
Equipment Description |
8 |
6.4 |
Process Flowsheet and P&IDs |
8 |
6.5 |
Combined Cycle System Performance Using Natural Gas |
9 |
7. |
SITE SPECIFIC ALTERNATE DESIGN CASES |
10 |
7.1 |
Heat and Material Balances |
10 |
7.2 |
Project Economics |
11 |
8. |
TOMS CREEK PROJECT RECONFIGURATION |
11 |
8.1 |
GE’s 6(FA) Gas Turbine |
11 |
8.2 |
Toms Creek Configuration Change |
12 |
8.3 |
Toms Creek Plant Size Comparison |
13 |
8.4 |
Technical Risk for IGCC Plant Scale-Up |
13 |
8.5 |
Steam Cycle Design |
14 |