Part 1, Pages 1 – 61, 3.17 MB |
Glossary |
3 |
Table of Contents |
7 |
1.0 |
Introduction |
7 |
2.0 |
Program Background |
7 |
3.0 |
Technology Overview |
9 |
4.0 |
Design Considerations |
10 |
4.1 |
Location and Description of Site |
10 |
4.2 |
Area Geology |
11 |
4.3 |
Environmental, Safety, and Hazard Considerations |
12 |
4.4 |
Supplied Utilities |
13 |
4.4.1 |
Coal Supply |
13 |
4.4.2 |
Limestone |
14 |
4.4.3 |
Natural Gas |
14 |
4.4.4 |
Electric Power |
14 |
4.4.5 |
Water Requirement and Availability |
14 |
4.4.6 |
Transportation System |
14 |
4.4.7 |
Solid Waste Handling |
16 |
5.0 |
Plant Description |
16 |
5.1 |
Combined Cycle |
16 |
5.1.1 |
Gas Turbine Generator (Area 700) |
16 |
5.1.2 |
Steam Turbine Generator and Heat Recovery Steam Generator (Area 800) |
17 |
5.1.2.1 |
Heat Recovery Steam Generator |
17 |
5.1.2.2 |
Stack |
18 |
5.1.2.3 |
Steam Turbine Generator |
18 |
5.2 |
Gasifier Island |
19 |
5.2.1 |
Coal Gasification (Area 300) |
19 |
5.2.2 |
Oxidant Compression and Supply (Area 200) |
21 |
5.2.3 |
Gas Stream Heat Recovery (Area 400) |
21 |
5.2.4 |
Gas Stream Particulate Removal (Area 500) |
22 |
5.2.5 |
Desulfurization (Area 600) |
23 |
5.2.6 |
Recycle Gas Compression (Area 900) |
25 |
5.3 |
Offsites |
26 |
5.3.1 |
Solids Receiving and Grinding (Area 100) |
26 |
5.3.1.1 |
Raw Coal Receiving and Storage |
26 |
5.3.1.2 |
Coal Crushing and Screening |
27 |
5.3.1.3 |
Coal, Coke, and Limestone Feeding |
28 |
5.3.1.4 |
Dust Collection System |
29 |
5.3.2 |
Solid Waste Handling (Area 1100) |
29 |
5.3.3 |
Balance of Plant (Area 1200) |
30 |
5.3.3.1 |
Raw Water System |
30 |
5.3.3.2 |
Boiler Feedwater Supply and Storage |
30 |
5.3.3.3 |
Boiler Water Treatment System |
31 |
5.3.3.4 |
Cooling Water System |
31 |
5.3.3.5 |
Instrument and Plant Air System |
32 |
5.3.3.6 |
Flare System |
32 |
5.3.3.7 |
Nitrogen System |
33 |
|
5.3.3.8 |
Propane System |
33 |
5.3.4 |
Waste Water Treatment (Area 1000) |
33 |
5.4 |
Electrical Distribution |
34 |
5.5 |
Instrumentation |
35 |
5.5.1 |
Digital Control System (DCS) |
35 |
5.5.2 |
Continuous Emission Monitoring System (CEMS) |
35 |
5.5.3 |
Water Analysis |
35 |
5.6 |
Fire Protection System |
36 |
5.7 |
Buildings |
36 |
5.8 |
Access Roads/Storm Water Treatment |
37 |
5.8.1 |
Drainage and Erosion Control |
37 |
5.8.2 |
Area Surfacing and Roads |
37 |
6.0 |
Estimated Plant Performance |
38 |
7.0 |
Appendices |
39 |
7.1 |
Equipment List |
41 |
7.2 |
Process Flow Diagrams (PFDs) |
62 |
Part 2, Pages 62 – 181, 2.92 MB |
|
7.3 |
Plot Plans |
125 |
7.4 |
Heat and Material Balances |
162 |