Process Selection and
Investment Analysis, Methanation Facility for
Purox
Pyrolysis System Off-Gas - September 1981.
Sassi Corporation
Part
1, Pages i - 106, 5.53 MB
Part 2, Appendices., 3.93 MB
Table of Contents
Part
1, Pages i - 106, 5.53 MB |
Introduction and Technical Summary |
v |
1. |
Process Selection |
1 |
Overview |
1 |
Reasons for Upgrading Gas |
2 |
Methanation Process |
3 |
2. |
Basis for Design |
|
Introduction |
7 |
Units |
7 |
Specifications to Establish the Basis for Design |
7 |
3. |
Process Description |
13 |
Introduction |
13 |
Benzol Wash |
13 |
Feed Gas Compression |
18 |
Hydrogenation |
20 |
Sulfur and Chloride Removal |
20 |
Stretford Plant |
22 |
Catalytic Upgrading |
26 |
CO2 Removal |
28 |
Glycol Dehydration Package |
34 |
Material Balance |
35 |
Total Water Balance |
35 |
Part 2, Appendices, 3.93 MB |
A |
Specifications for Vessels and Tanks |
107 |
B |
Direct-Fired Equipment |
129 |
C |
Heat Exchangers |
133 |
D |
Mechanical and Packaged Equipment |