Progress Report No. 1 |
Section 1
813kb |
I |
Introduction |
1 |
|
A |
Work Schedule |
1 |
B |
Monthly Progress Charts |
1 |
II |
Phase II Progress Achieved During Month Ending
September 25, 1971 |
1 |
|
A |
Laboratory-scale Process Studies |
1 |
|
1 |
Coal Composition and Beneficiation Studies (R.G. Moses and
R.D. Saltsman) |
1 |
2 |
Laboratory Pyrolysis of Coal (J.E. Noll) |
3 |
3 |
Fluidized-bed Gasification (E.K. Diehl and J.T. Stewart) |
3 |
4 |
Gas Processing (M.S. Graboski) |
6 |
5 |
Analytical Services (J. E. Noll) |
23 |
6 |
Carbon-14 Procedures (J.E. Noll) |
23 |
7 |
Gas Chromatographic Procedures (J. E. Noll) |
23 |
Section 2
981kb |
|
B |
Stage 2 Process and Equipment Development
Unit--100 lb/hr (R. J. Grade, F. du Breuil, E. E. Donath, and R. L.
Zahradnik) |
24 |
|
1 |
Data and Results for PEDU Test 54 with "As-used"
Lignite (1963-8016-49) at 1,000 psig Using Long Coal Feed Nozzle |
24 |
2 |
Data and Results for PEDU Test 55 with "As-used"
Lignite (1963-8016-49) at 500 psig Using Long Coal Feed Nozzle |
24 |
3 |
Data and Results for PEDU Test 56 with "As-used"
Lignite (1963-8016-49) at 1,000 psig Using Long Coal Feed Nozzle |
24 |
4 |
Data and Results for PEDU Test 57 with Pittsburgh Seam
Coal (2734-8016-19) at 1,000 psig Using Long Coal Feed Nozzle (1 inch
below center line Stage 1 |
24 |
5 |
Data and Results for PEDU Test 58 with Pittsburgh Seam
Coal (2734-8016-19) at 1,000 psig Using Long Coal Feed Nozzle with Short
Residence Time |
33 |
6 |
Discussion of Results for PEDU Tests 54, 55 and 56 Using
"As-used" Lignite and Long Coal Feed Nozzle |
35 |
7 |
Extension and Termination of Stage 2 PEDU Test Program |
41 |
8 |
Fluidized Weighing Tests |
41 |
9 |
Inspection of Long Coal Feed Nozzle, Creosote and Gas
Burners After PEDU Tests 57 and 58z |
43 |
10 |
Inspection of Reactor After PEDU Tests 57 and 58 |
44 |
11 |
Oxygen and Nitrogen Deliveries |
44 |
12 |
Benzene, Coal, and Cyclohexane Deliveries |
44 |
13 |
System Changes and Additions |
44 |
14 |
Future Work |
49 |
C |
Cold Flow Model Experiments - 5 ton/hr
Two-stage Gasifier (R. J. Grace, J. E. Noll, R. D. Harris, R. L.
Zahradnik, and E. E. Donath) |
46 |
D |
Data Processing (R.K. Young and D.R. Hauck) |
51 |
|
1 |
Stage 2 PEDU |
51 |
2 |
Commercial Gasifier Modeling |
51 |
3 |
Automated Data Acquisition |
51 |
4 |
Future Work |
51 |
E |
Engineering Design and Evaluation |
51 |
|
1 |
BI-GAS Process |
51 |
2 |
OCR/BCR Gasification--Power Generation |
51 |
3 |
Fischer-Tropsch System |
52 |
4 |
Electric Energy for Heat to Stage 1 |
52 |
F |
Multipurpose Research Pilot Plant Facility (MPRF) |
52 |
G |
Literature Search (V. E. Gleason) |
53 |
H |
Other |
53 |
|
1 |
Prime Contract Matters |
53 |
2 |
Outside Engineering and Services |
53 |
3 |
Brigham Young University |
53 |
4 |
Reports and Papers |
56 |
5 |
Patent Matters |
56 |
I |
Visitors During September, 1971 |
57 |
J |
Trips, Visitors, and Meetings During September |
58 |
K |
Requests for Information |
58 |
Section 3
865kb |
III |
Work Planned for October, 1971 |
59 |
|
A |
Trips and Meetings Planned |
59 |
B |
Visitors Expected |
59 |
C |
Papers to be Presented |
60 |
Appendix A-1 Manhours |
61 |
Appendix A-2 Cumulative Expenditures |
62 |
Appendix B Bi-Gas Stage 1 Temperatures
with Complete Char Recycle |
63 |
Appendix C Oxygen Cost from APCI Report |
77 |
Appendix D Cost of Fuel Gas by the
Bi-Gas Process |
80 |
Appendix E Comparison of the Cost of
Using Oxygen or Electric Heating in Stage 1 of the Bi-Gas Process |
84 |
Appendix F Koppers Progress Report No.
26 |
|
Appendix G Additions to Abstract File,
September 1971 |
101 |
|
|
|
|
|
|
Progress Report No. 2 |
Section 1
576kb |
I |
Introduction |
102 |
|
A |
Work Schedule |
102 |
B |
Monthly Progress Charts |
102 |
II |
Phase II Progress Achieved During
Month Ending October 15, 1971 |
102 |
|
A |
Laboratory-scale Process Studies |
102 |
|
1 |
Coal Composition and Beneficiation Studies (R.
G. Moses and R.D. Saltsman) |
102 |
2 |
Laboratory Pyrolysis of Coal (J. E. Noll) |
102 |
3 |
Fluidized-bed Gasification (E. K. Diehl and J.
T. Stewart) |
103 |
4 |
Gas Processing (M. S. Graboski) |
103 |
5 |
Analytical Services (J. E. Noll) |
122 |
6 |
Carbon-14 Procedures (J. E. Noll) |
122 |
7 |
Gas Chromatographic Procedures (J. E. Noll) |
122 |
Section 2
843kb |
B |
Stage 2 Process and Equipment
Development Unit--100 lb/hr (R. J. Grace, F. du Breuil, E. E. Donath,
and R. L. Zahradnik) |
123 |
|
1 |
Corrected Results for Stage 2 Performance
Criteria for PEDU Test 55 with "As-used" Lignite
(1963-8016-49) at 500 psig Using Long Coal Feed Nozzle |
123 |
2 |
Data and Results for PEDU Test 57 with
Pittsburgh Seam Coal (2734-8016-19) at 1,000 psig Using Long Coal Feed
Nozzle with Short Residence Time |
123 |
3 |
Data and Results for PEDU Test 57 with
Pittsburgh Seam Coal (2734-8016-19) at 1,000 psig Using Long Coal Feed
Nozzle with Short Residence Time |
123 |
4 |
Discussion of Results for PEDU Test 57 with
Pittsburgh Seam Coal (2734-8016-19) at 1,000 psig Using Long Coal Feed
Nozzle (1 inch below center line of Stage 1) |
123 |
5 |
Discussion of Results for PEDU Test 58 with
Pittsburgh Seam Coal at 1,000 psig Using Long Coal Feed Nozzle with
Short Residence Time |
135 |
6 |
Pittsburgh Seam High Volatile A Bituminous
Coal, Fifth Feedstock Preparation |
137 |
7 |
Oxygen and Nitrogen Deliveries |
139 |
8 |
Benzene, Coal, and Cyclohexane Deliveries |
139 |
9 |
Future Work |
139 |
C |
Cold Flow Model Experiements-5
ton/hr Two-stage Gasifier (R. J. Grace, J. E. Noll, R. D. Harris, R. L.
Zahradnik, and E. E. Donath) |
140 |
|
1 |
Phase I Model Tests |
140 |
2 |
Gas Analyzing Procedure and
Equipment |
140 |
3 |
Phase III Model Tests |
143 |
4 |
Future Work |
143 |
D |
Data Processing (R. K. Young and
D. R. Hauck) |
145 |
|
1 |
Stage 2 PEDU |
145 |
2 |
Commercial Gasifier Modeling |
145 |
3 |
Automated Data Acquisition |
145 |
4 |
Future Work |
145 |
E |
Engineering Design and Evaluation |
145 |
|
1 |
BI-GAS Process |
145 |
2 |
OCR/BCR Gasification--Power
Generation |
145 |
3 |
Fischer-Tropsch System |
146 |
F |
Multipurpose Research Pilot Plant
Facility (MFPF) |
146 |
G |
Literature Search (V. E. Gleason) |
146 |
H |
Other |
146 |
|
1 |
Prime Contract Matters |
146 |
2 |
Outside Engineering and Services |
146 |
3 |
Brigham Young University |
146 |
4 |
Reports and Papers |
148 |
5 |
Patent Matters |
148 |
I |
Visitors During October, 1971 |
152 |
J |
Trips, Visits, and Meetings During
October |
151 |
K |
Requests for Information |
151 |
III |
Work Planned for November, 1971 |
152 |
|
A |
Trips and Meetings Planned |
152 |
B |
Visitors Expected |
152 |
C |
Papers to be Presented |
152 |
Appendix A-1 |
153 |
Appendix A-2 |
154 |
Appendix B |
155 |
|
|
|
Project Report No. 3 |
Section 1
759kb |
I |
Introduction |
158 |
|
A |
Work Schedule |
158 |
B |
Monthly Progress Charts |
158 |
II |
Phase II Progress Achieved During
Month Ending November 25, 1971 |
158 |
|
A |
Laboratory-scale Process Studies |
158 |
|
1 |
Coal Composition and Beneficiation
Studies (R. G. Moses and R. D. Saltsman) |
158 |
2 |
Laboratory Pyrolysis of Coal (J.
E. Noll) |
158 |
3 |
Fluidized-bed Gasification (E. K.
Diehl and J. T. Stewart) |
159 |
|
a |
Fluidized-bed PEDU |
159 |
b |
Laboratory Investigation |
159 |
c |
Future Work |
163 |
4 |
Gas Processing (M. S. Graboski) |
163 |
|
a |
Bench-scale Studies |
163 |
|
(1) |
Data and Results for BSM Test 41 |
163 |
(2) |
Data and Results for BSM Tests 42 and 43 |
163 |
(3) |
Data and Results for BSM Tests 44 and 45 |
163 |
(4) |
Discussion of BSM Tests 41 to 45 |
170 |
b |
PEDU Program |
173 |
|
(1) |
PEDU Design Status |
173 |
(2) |
Cold Model Program |
177 |
c |
Future Work |
181 |
5 |
Analytical Services (J. E. Noll) |
181 |
6 |
Gas Chromatographic Procedures (J.
E. Noll) |
181 |
Section 2
927kb |
B |
Stage 2 Process and Equipment
Development Unit--100 lb/hr (R. J. Grace, E. E. Donath, and R. L.
Zahradnik) |
182 |
|
1 |
Nitrogen Distribution in Products
from PEDU Tests |
182 |
2 |
Linde Oxygen and Nitrogen
Installation |
182 |
3 |
Carbon 14 (C-14) Cleanup |
182 |
4 |
Disposition of Surplus
Concentrated Carbon 14 (C-14) |
182 |
5 |
Inspection of Reactor Internal
Metal Surfaces in PEDU |
184 |
6 |
Future Work |
184 |
C |
Cold Flow Model Experiments--5
ton/hr Two-stage Gasifier (R. J. Grace, J. E. Noll, R. D. Harris, R. L.
Zahradnik, and E. E. Donath) |
184 |
|
1 |
Phase I Model Tests |
184 |
|
a |
Summary |
184 |
b |
Description of Equipment |
185 |
|
(1) |
Prototype Burner |
185 |
(2) |
Test Vessel |
185 |
(3) |
Sampling and Analysis |
186 |
c |
Test Procedure |
186 |
d |
Test Results |
187 |
e |
Interpretation of Results |
187 |
2 |
Phase II Model Tests |
195 |
3 |
Phase III Model Tests |
195 |
4 |
Future Work |
200 |
D |
Data Processing (R. K. Young and
D. R. Hauck) |
200 |
|
1 |
Commercial Gasifier Modeling |
200 |
2 |
Automated Data Acquisition |
200 |
3 |
Future Work |
200 |
E |
Engineering Design and Evaluation |
200 |
|
1 |
BI-GAS Process |
200 |
2 |
OCR/BCR Gasification--Power
Generation |
202 |
3 |
Fischer-Tropsch System |
202 |
F |
Multipurpose Research Pilot Plant
Facility (MPRF) |
202 |
G |
Literature Search (V. E. Gleason) |
203 |
H |
Other |
203 |
|
1 |
Prime Contract Matters |
203 |
2 |
Outside Engineering and Services |
203 |
3 |
Brigham Young University |
203 |
4 |
Reports and Papers |
205 |
5 |
Patent Matters |
205 |
|
a |
OCR-866 and OCR-1078 |
205 |
b |
New Invention Disclosures |
205 |
I |
Visitors During November 1971 |
206 |
J |
Trips, Visits, and Meetings During
November |
206 |
K |
Requests for Information |
206 |
III |
Work Planned for December, 1971 |
207 |
|
A |
Trips and Meetings Planned |
207 |
B |
Visitors Expected |
208 |
C |
Papers to be Presented |
208 |
Appendix A-1 |
209 |
Appendix A-2 |
210 |
Appendix B |
211 |
Appendix C |
214 |
|
|
|
Progress Report No. 4 |
|
Section 1
556kb |
I |
Introduction |
216 |
|
A |
Work Schedule |
216 |
B |
Monthly Progress Charts |
216 |
II |
Phase II Progress Achieved During
Month Ending December 25, 1971 |
216 |
|
A |
Laboratory-scale Process Studies |
216 |
|
1 |
Coal Composition and Beneficiation
Studies, and Laboratory Pyrolysis of Coal (R. G. Moses, R. D. Saltsman
and J. E. Noll |
216 |
2 |
Fluidized-bed Gasification (E. K.
Diehl and J. T. Stewart) |
217 |
|
a |
Fluidized-bed PEDU |
217 |
b |
Laboratory Investigation |
217 |
c |
Future Work |
218 |
3 |
Gas Processing (M. S. Graboski) |
218 |
|
a |
Bench-scale Studies |
218 |
|
(1) |
Data and Results for BSM Test 46 |
222 |
(2) |
Data and Results for BSM Test 47 and 48 |
222 |
(3) |
Discussion of BSM Tests 46 to 48 |
222 |
(4) |
Life Test of Catalyst 2903 |
222 |
b |
PEDU Program |
224 |
|
(1) |
PEDU Status |
224 |
(2) |
Cold Model Program |
224 |
c |
Other Work |
226 |
|
(1) |
Status of BCR Suggestion 193 |
226 |
(2) |
Status of BCR Suggestion 194 |
226 |
d |
Future Work |
226 |
4 |
Laboratory Pyrolysis of Coal (J.
E. Noll) |
226 |
5 |
Analytical Services (J. E. Noll) |
227 |
6 |
Gas Chromatographic Procedures (J.
E. Noll) |
227 |
B |
Stage 2 Process and Equipment
Development Unit--100 lb/hr (R. J. Grace, E. E. Donath, and R. L.
Zahradnik) |
228 |
|
1 |
Inspection of Reactor Refractories
and Internal Metal Surfaces in PEDU |
228 |
2 |
Future Work |
228 |
Section 2
623kb |
C |
Cold Flow Model Experiments--5
ton/hr Two-stage Gasifier (R. J. Grace, J. E. Noll, R. D. Harris, R. L.
Zahradnik, and E. E. Donath) |
232 |
|
1 |
Characterization of Chars from
PEDU Tests 27 and 28 |
232 |
|
a |
Hardness Tests |
233 |
b |
Fluidization Tests |
233 |
2 |
Future Work |
237 |
D |
Data Processing (R. K. Young and
D. R. Hauck) |
237 |
|
1 |
Commercial Gasifier Modeling |
237 |
2 |
Automated Data Acquisition |
240 |
3 |
Subroutine ENERGY |
240 |
4 |
Future Work |
240 |
E |
Engineering Design and Evaluation |
240 |
|
1 |
BI-GAS Process |
240 |
2 |
OCR/BCR Gasification--Power
Generation |
240 |
3 |
Fischer-Tropsch System |
241 |
F |
Multipurpose Research Pilot Plant
Facility (MPRF) |
241 |
|
1 |
AGA Materials Evaluation Program |
241 |
2 |
Model Status |
241 |
3 |
Reports and Papers |
241 |
4 |
Patent Matters |
241 |
|
a |
OCR-866 and OCR-1078 |
241 |
b |
New Invention Disclosures |
241 |
|
(1) |
OCR-1859 |
242 |
(2) |
OCR-1860 and OCR 1861 |
242 |
(3) |
OCR-1862 |
242 |
(4) |
OCR-1863 |
242 |
(5) |
OCR-1864 |
242 |
G |
Literature Search (V. E. Gleason) |
242 |
H |
Other |
242 |
|
1 |
Prime Contract Matters |
242 |
2 |
Outside Engineering and Services |
242 |
3 |
Brigham Young University |
243 |
I |
Visitors During December, 1971 |
243 |
J |
Trips, Visits, and Meetings During
December |
245 |
K |
Requests for Information |
245 |
III |
Work Planned for January, 1972 |
246 |
|
A |
Trips and Meetings Planned |
246 |
B |
Papers to be Presented |
246 |
C |
Visitors Expected |
246 |
Appendix A-1 Manhours |
248 |
Appendix A-2 Cumulative
Expenditures |
249 |
Appendix B Koppers Progress Report
No. 29 |
B-250 |
Appendix C Additions to Abstract
File, December 1971 |
C-252 |