TITLE: PDU Run 10. INST. AUTHOR: Hydrocarbon Research, Inc., Lawrenceville, NJ. SPONSOR: Department of Energy, Washington, DC. LANGUAGE: English PUB. TYPE: Technical Report PUB. COUNTRY: United States SOURCE: Department of Energy [DE], Sep 81, 295p. ABSTRACT: PDU Run 10, a 46-day H-Coal syncrude mode operation using Wyodak coal, successfully met all targeted objectives, and was the longest PDU operation to date in this program. Targeted coal conversion of 90 W % was exceeded with a C sub 4 -975 exp 0 F distillate yield of 43 to 48 W %. Amocat 1A catalyst was qualified for Pilot Plant operation based on improved operation and superior performance. PDU 10 achieved improved yields and lower hydrogen consumption compared to PDU 6, a similar operation. High hydroclone efficiency and high solids content in the vacuum still were maintained throughout the run. Steady operations at lower oil/solids ratios were demonstrated. Microautoclave testing was introduced as an operational aid. Four additional studies were successfully completed during PDU 10. These included a catalyst tracer study in conjunction with Sandia Laboratories; tests on letdown valve trims for Battelle; a fluid dynamics study with Amoco; and special high-pressure liquid sampling for the Oak Ridge Laboratory. (ERA citation 07:006634) REPORT NUMBER: DOE/ET/10152-67 CONTRACT NUMBER: AC05-77ET10152 |