TITLE: Baseline design/economics for advanced Fischer-Tropsch technology. Quarterly report, October--December 1993. INST. AUTHOR: Department of Energy, Pittsburgh, PA. Pittsburgh Energy Technology Center; Bechtel National, Inc., Richland, WA; Amoco Research Center, Naperville, IL. LANGUAGE: English PUB. TYPE: Technical Report PUB. COUNTRY: United States SOURCE: Department of Energy [DE], 1993, 34p. NTIS ORDER NO.: DE95011377INW ABSTRACT: The objectives of the study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin. Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases will be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation model. The baseline design, the economic analysis and computer model will be major research planning tools that PETC will use to plan, guide and evaluate its ongoing and future research and commercialization programs relating to indirect coal liquefaction for the manufacture of synthetic liquid fuels from coal. The study has been divided into seven major tasks. Task 1: Establish the baseline design and alternatives. Task 2: Evaluate baseline and alternative economics. Task 3: Develop engineering design criteria. Task 4: Develop a process flowsheet simulation model. Task 5: Perform sensitivity studies using the PFS model. Task 6: Document the PFS model and develop a DOE training session on its use, and Task 7: Perform project management, technical coordination and other miscellaneous support functions. During the reporting period, work progressed on Tasks 1, 4 and 7. This report covers work done during the period and consists of four sections: Introduction and Summary. Task 1--Baseline Design and Alternatives. Task 4--Process Flowsheet Simulation Model. Project Management and Staffing Report. REPORT NUMBER: DOE/PC/90027-T10 CONTRACT NUMBER: AC22-91PC90027 |