603. ---------------. [COKE AND SMOKELESS-FREE AGE.] Lurgi Process. Vol. 8, 1946, p. 49-50, 54. Latest information about the Lurgi complete-gasification plant at Böhlen, Germany, reports a plant of 10 units, with a capacity of about 20,000,000 cu. ft. of gas per day. The complete plant cost 10,720,000 RM; the Linde-Fränkl O2 plant 3,600,000 RM. Information is given on the modern type machinery and its operation, the gas-purifying plant, and an analysis of the fuel used. The consumption of materials per 1,000 cu. ft. of gas is: O2 145 cu. ft., steam 90 lb., coal 90 lb.; electricity 6-7 kw.-hr.; there 0.77 lb. of tar and 0.33 lb. of light oil are produced per 100 cu. ft. of gas. Operating costs are as follows: coal 6.50 RM per ton; water 6 pf. per m.3 power 1.1 pf. per kw.-hr.; labor and maintenance each 0.4 pf. per m.3 of gas; oxygen 2.2 pf. per m.3 The total cost of the gas was 3.8 pf. per m.3 less a credit of 1.4 pf. per m.3, or a net cost of 2.4 pf. per m.3 or 10.9 d. per 1,000 cu. ft. |