Acronyms and Definitions |
4 |
1 |
Introduction |
6 |
2 |
Project Description |
6 |
3 |
Process Description |
7 |
4 |
Environmental Monitoring Plan (EMP) Description |
9 |
|
4.1 |
Eastman Reporting of Publicly Available Technical
Data |
9 |
4.2 |
Compliance Monitoring |
10 |
4.3 |
Supplemental Monitoring |
10 |
5 |
Project Summary |
14 |
6 |
Update on Eastman "Chemicals-from-Coal" Publicly
Available Technical Data |
14 |
|
6.1 |
Gasifier Facility |
14 |
6.2 |
10C-30 Catalyst Guard Bed |
14 |
6.3 |
Wastewater and Alcohols to Wastewater Treatment
System |
14 |
7 |
Compliance Monitoring |
16 |
|
7.1 |
Combined Vapor Flow from Demonstration Unit to
Boiler |
16 |
7.2 |
Fugitive Emissions |
16 |
|
7.2.1 |
Leak Detection and Repair (LDR) |
16 |
7.2.2 |
Ambient Carbon Monoxide Background Concentration |
16 |
7.3 |
Particulate Emissions |
16 |
7.4 |
Wastewater Treatment System Outlet Stream |
16 |
8 |
Supplemental Monitoring |
17 |
|
8.1 |
Total Synthesis Gas Use and Methanol Production |
17 |
8.2 |
Oil/Water Separator |
17 |
8.3 |
Compressor and Pump Lubricants |
17 |
8.4 |
Spent Catalyst Slurry |
17 |
8.5 |
29C-40 Catalyst Guard Bed Spent Adsorbent |
17 |
8.6 |
Noise |
17 |
9 |
Compliance |
19 |
|
9.1 |
Compliance with Permit Limits |
19 |
10 |
Problems and Recommendations |
19 |
|
APPENDICES |
20 |
APPENDIX A - SIMPLIFIED PROCESS FLOW DIAGRAM |
20 |
APPENDIX B - DUST EXPOSURE SURVEY DURING CATALYST
LOADING |
21 |
APPENDIX C - NPDES REPORT FOR WASTEWATER TREATMENT
SYSTEM OUTLET STREAM |
22 |
APPENDIX D - PLANT-WIDE NOISE DOSIMETRY MEASUREMENTS |
23 |