List of Tables |
iii |
List of Figures |
iii |
List of Acronyms and Abbreviations |
v |
|
EXECUTIVE SUMMARY
(1.45MB) |
ES-1 |
1 |
INTRODUCTION
(231kb) |
1-1 |
|
1.1 |
Background |
1-1 |
|
1.1.1 |
Plant Configurations |
1-1 |
1.1.2 |
Summary of Plant Differences |
1-3 |
1.1.3 |
Financial Assumptions and Cost Data |
1-3 |
1.1.4 |
Capital and Operating Costs |
1-4 |
1.1.5 |
The Need for Reconciliation of Cost Estimates |
1-4 |
1.2 |
Task Objectives |
1-5 |
1.3 |
Plant Design Basis |
1-6 |
|
1.3.1 |
Plant Capacity and Availability |
1-6 |
1.4 |
Process Selection |
1-9 |
|
1.4.1 |
Gasifier |
1-9 |
1.4.2 |
Shift Reactor Catalyst |
1-9 |
1.4.3 |
Acid Gas Removal |
1-9 |
1.4.4 |
Hydrogen Purification |
1-10 |
1.5 |
Approach to Cost Estimating |
1-11 |
|
1.5.1 |
Gasifier |
1-11 |
1.5.2 |
Acid Gas Removal |
1-11 |
1.5.3 |
Sulfur Recovery and Tail Gas Cleanup |
1-11 |
1.5.4 |
Hydrogen Purification |
1-12 |
1.5.5 |
Shift Reactors |
1-12 |
1.5.6 |
Candle Filters |
1-12 |
1.5.7 |
Air Separation Unit |
1-12 |
1.5.8 |
Balance of Plant |
1-12 |
2 |
PITTSBURGH NO.
8 COAL (3.02MB) |
2-1 |
|
2.1 |
Health and Material Balance |
2-1 |
2.2 |
Process Description |
2-7 |
|
2.2.1 |
Gasifier |
2-7 |
2.2.2 |
Air Separation Unit |
2-7 |
2.2.3 |
Particulate Removal |
2-7 |
2.2.4 |
CO Shift |
2-7 |
2.2.5 |
Amine Unit/Acid Gas Concentrator |
2-8 |
2.2.6 |
Hydrogen Purification |
2-8 |
2.3 |
Major Equipment List for Bituminous Coal Case |
2-9 |
2.4 |
Capital Cost |
2-15 |
2.5 |
Determination of Cost of Hydrogen from Pittsburgh
No. 8 Coal |
2-15 |
|
2.5.1 |
Approach to Cost Estimating |
2-16 |
2.5.2 |
Production Costs (Operation and Maintenance) |
2-16 |
2.5.3 |
Consumables |
2-17 |
2.5.4 |
Byproduct Credits |
2-18 |
2.5.5 |
Financial Assumptions |
2-18 |
2.5.6 |
Cost Results |
2-18 |
3 |
WYODAK PRB COAL
(2.97MB) |
3-1 |
|
3.1 |
Heat and Material Balance |
3-1 |
3.2 |
Process Description |
3-7 |
|
3.2.1 |
Gasifier |
3-7 |
3.2.2 |
Air Separation Unit |
3-7 |
3.2.3 |
Particulate Removal |
3-7 |
3.2.4 |
CO Shift |
3-7 |
3.2.5 |
Amine Unit/Acid Gas Concentrator |
3-8 |
3.2.6 |
Hydrogen Purification |
3-8 |
3.3 |
Major Equipment List for Wyodak Coal Case |
3-9 |
3.4 |
Capital and Operating Costs for Hydrogen from Wyodak
PRB Coal |
3-16 |
3.5 |
Determination of Cost of Hydrogen from Wydoak PRB
Coal Using Preliminary Assumptions |
3-16 |
|
3.5.1 |
Approach to Cost Estimating |
3-17 |
3.5.2 |
Production Costs (Operation and Maintenance) |
3-18 |
3.5.3 |
Consumables |
3-18 |
3.5.4 |
Byproduct Credits |
3-18 |
3.5.5 |
Financial Assumptions |
3-18 |
3.5.6 |
Cost Results |
3-19 |
4 |
COST OF
HYDROGEN USING THE DOE IGCC FINANCIAL MODEL (122kb) |
4-1 |
|
Appendix A |
Pittsburgh No.
8 Coal with DOE IGCC Financial Model (5.64MB) |
Appendix B |
Wyodak PRB
Coal with DOE IGCC Financial Model (5.54MB) |
|
LIST OF TABLES |
ES-1 |
Design Criteria for Conventional Hydrogen Production
Plant |
ES-3 |
ES-2 |
Performance Summary - Hydrogen Production from
Pittsburgh No. 8 Coal |
ES-5 |
ES-3 |
Capital Cost Summary - Hydrogen Production from
Pittsburgh No. 8 Coal |
ES-6 |
ES-4 |
Performance Summary - Hydrogen Production from
Wydoak Coal |
ES-8 |
ES-5 |
Capitol Cost Summary - Hydrogen Production from
Wydoak Coal |
ES-8 |
ES-6 |
Financial Parameters |
ES-10 |
1-1 |
Comparison of Parsons and NREL Plants |
1-2 |
1-2 |
Performance Summary |
1-3 |
1-3 |
Financial Assumptions |
1-3 |
1-4 |
Capital and Operating Cost Comparisons |
1-4 |
1-5 |
Coal Analysis - Pittsburgh No. 8 |
1-7 |
1-6 |
Wyodak Coal Properties |
1-8 |
1-7 |
Design Criteria for Conventional Hydrogen Production
Plant |
1-8 |
2-1 |
Plant Performance Summary - Hydrogen Production from
Pittsburgh No. 8 Coal |
2-3 |
2-2 |
Process Stream Compositions and State Points -
Pittsburgh No. 8 Coal |
2-5 |
2-3 |
Capital Cost Summary - Hydrogen Production from
Pittsburgh No. 8 Coal |
2-15 |
2-4 |
Operating Cost Data |
2-17 |
2-5 |
Financial Parameters |
2-18 |
2-6 |
Capital Investment & Revenue Requirement Summary |
2-19 |
3-1 |
Plant Performance Summary - Hydrogen Production from
Wydoak Coal |
3-3 |
3-2 |
Process Stream Compositions and State Points -
Wyodak Coal |
3-5 |
3-3 |
Capital Cost Summary - Hydrogen Production from
Wyodak Coal |
3-16 |
3-4 |
Operating Cost Data |
3-18 |
3-5 |
Financial Parameters |
3-19 |
3-6 |
Capital Investment & Revenue Requirement Summary |
3-20 |
|
LIST OF FIGURES |
ES-1 |
Block Flow Diagram - Conventional Hydrogen Plant |
ES-2 |
ES-2 |
Sensitivity of IRR to Hydrogen Costs |
ES-10 |
1-1 |
Block Flow Diagram - Conventional Hydrogen Plant |
1-5 |
2-1 |
Heat and Mass Balance - E-GasTM Gasifier-Based
Hydrogen Production Plant - Pittsburgh No. 8 Coal |
2-2 |
2-2 |
Process Block Flow Diagram - E-GasTM
Gasifier-Based Hydrogen Production plant - Pittsburgh No. 8 Coal |
2-4 |
3-1 |
Heat and Mass Balance - E-GasTM Gasifier-Based
Hydrogen Production Plant - Wyodak Coal |
2-2 |
3-2 |
Process Block Flow Diagram - E-GasTM
Gasifier-Based Hydrogen Production plant - Wyodak Coal |
2-4 |
4-1 |
Sensitivity of IRR to Hydrogen Costs |
4-1 |