Return to DOE Reports Table of Contents - S

Preliminary Design and Assessment of a 50,000 BPD Coal-to-Gasoline-to-Methanol Plant.

Process Engineering and Mechanical Design Reports.  Volume II of IV, Deliverable 14B.  Preliminary Design and Assessment of a 12,500 BPD
Coal-to-Gasoline-to-Methanol Plant - September 2, 1982.

Stewart, R. M.
W. R. Grace & CO.

 The Ralph M. Parsons Company

Table of Contents

 

Part 1, Pages 1 - 175, 5.84 MB

1.

Facilities Design

II-1-1

1.1

General Constraints

II-1-1

1.1.1

Codes and Standards

II-1-1

1.1.2

Regulatory standards and Requirements

II-1-2

1.1.3

Sparing Criteria

II-1-4

1.1.4

Special Metallurgical Requirements

II-1-5

1.2

Process Units Design

II-1.2-1

1.2.1

Coal Receiving and Unloading Unit 11

II-1.2.1.1

1.2.2

Coal Conveying and Storage Unit 12

II-1.2.2.1

1.2.3

Coal Stacking and Reclaiming Unit 13

II-1-2.3-1

1.2.4

Solid Waste Collection and Disposal Unit 14

II-1.2.4-1

1.2.5

Gasification Unit 21

II-12.5-1

1.2.6

Oxygen Unit 22

II-1.2.6-1

1.2.7

CO Shift Unit 23

II-1.2.7-1

1.2.8

Coal Grinding and Slurry Preparation Unit 24

II-1.2.8-1

Part 2, Pages 176 - 227, 1.40 MB

 

 

1.2.9

Methanol Synthesis Unit 25

II-1.2.9-1

1.2.10

Ammonia Recovery Unit 26

II-1.2.10-1

1.2.11

Effluent Water Treatment (Texaco) Unit 27

III-1.2.11-1

1.2.12

Methanol-to-Gasoline Unit 31

III-1.2.13.-1

1.2.13

Gas Fractionation Unit 32

III-1.2.13-1

1.2.14

HF Alkylation Unit32

III-1.2.14-1

1.2.15

Acid Gas Removal Unit 34

III-1.2.15-1

1.2.16

Sulfur Recovery (Claus) Unit 36

III-1.2.16-1

1.2.17

Sulfur Removal (BSRP) Unit 37

III-1.2.17-1

1.2.18

Heavy Gasoline Treating Unit 38

II-1.2.18-1

1.2.19

Process Water Treatment Unit 39

III-1.2.19-1