TITLE: Baseline design/economics for advanced Fischer-Tropsch technology.  Quarterly report, July--September 1994.

INST.  AUTHOR: Bechtel National, Inc., Richland, WA;   Amoco Research Center, Naperville, IL.

LANGUAGE: English

PUB.  TYPE: Technical Report

PUB.  COUNTRY: United States

SOURCE: Department of Energy [DE],  1994,  11p.

NTIS ORDER NO.: DE95011379INW

ABSTRACT:

This report is Bechtel's twelfth quarterly technical progress report and covers the period of July through September, 1994. All major tasks associated with the contract study have essentially been completed. Effort is under way in preparing various topical reports for publication. The objectives of this study are to: Develop a baseline design and two alternative designs for indirect liquefaction using advanced F-T technology. The baseline design uses Illinois No. 6 Eastern Coal and conventional refining. There is an alternative refining case using ZSM-5 treatment of the vapor stream from the slurry F-T reactor and an alternative coal case using Western coal from the Powder River Basin.  Prepare the capital and operating costs for the baseline design and the alternatives. Individual plant costs for the alternative cases win be prorated on capacity, wherever possible, from the baseline case. Develop a process flowsheet simulation (PFS) model; establish the baseline design and alternatives; evaluate baseline and alternative economics; develop engineering design criteria; develop a process flowsheet simulation (PFS) model; perform sensitivity studies using the PFS model; document the PFS model and develop a DOE training session on its use; and perform project management, technical coordination and other miscellaneous support functions. Tasks 1, 2, 3 and 5 have essentially been completed. Effort is under way in preparing topical reports for publication. During the current reporting period, work progressed on Tasks 4, 6 and 7. This report covers work done during this period and consists of four sections: Introduction and Summary; Task 4 - Process Flowsheet Simulation (PFS) Model and Conversion to ASPEN PLUS; Task 6 - Document the PFS model and develop a DOE training session on its use; and Project Management and Staffing Report.

REPORT  NUMBER: DOE/PC/90027-T12

CONTRACT  NUMBER: AC22-91PC90027